CRITICAL PATH CONSTRUCTION
161 OCEAN DR, MIAMI BEACH, FL 33139
NAICS 238120: Structural Steel and Precast Concrete Contractors - Records current through Mar 6, 2015
CRITICAL PATH CONSTRUCTION has had 1 OSHA inspection since Mar 6, 2015 with no violations cited.
As reported in the U.S. Department of Labor OSHA enforcement database. Having inspection records is common for businesses in regulated industries. Penalty amounts may differ from final amounts after settlement or judicial review.
- The most recent OSHA inspection at this establishment was opened on March 6, 2015. That inspection has since been closed.
- This establishment has a clean inspection record with no violations cited across 1 inspection.
- All inspections at this establishment have been closed.
Data sourced from the U.S. Department of Labor OSHA enforcement database. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conferences, settlements, or adjudication. Having an inspection record is common in regulated industries and does not by itself indicate unsafe conditions. This is not an official OSHA resource and does not constitute legal advice.
Inspection Records2015 - 2015
Full record for each inspection on file. Includes type, scope, violations on record, and current penalty.
| ID | Opened | Type | Scope | Viol. | Penalties |
|---|---|---|---|---|---|
| #340501931 | Mar 6, 2015 | Unprogrammed Related | Complete | 0 | $0 |
About Workplace Inspections
OSHA workplace inspections are part of the federal government's effort to prevent work-related injuries, illnesses, and deaths. Each year, OSHA compliance officers conduct tens of thousands of inspections at workplaces across the country.
An inspection may cover the entire workplace (comprehensive) or focus on specific areas or hazards (partial). The scope depends on the reason for the inspection and the conditions observed during the visit.
About This Industry
NAICS 238120: Structural Steel and Precast Concrete Contractors / Construction
This industry comprises specialty trade contractors primarily engaged in erecting structural steel, precast concrete, and similar structural components for buildings and other structures.
Common workplace hazards include falls from elevated steel structures, struck-by incidents from crane-lifted loads, and caught-between hazards during steel connection work. Workers may also face risks from welding at heights, unstable structures during erection, and wind exposure on open frameworks.
Employers in structural steel and precast concrete contractors reported 2.8 work-related injuries and illnesses per 100 full-time workers in 2024, according to the U.S. Bureau of Labor Statistics Survey of Occupational Injuries and Illnesses.
This is an industry-wide average from a federal survey, not a measurement of this establishment. Industry code as assigned by OSHA on this establishment's inspection records (NAICS 238120, shown at the broader NAICS 23812 industry level published by BLS).
Data Source and Methodology
Data synced dailyData on this page comes from the U.S. Department of Labor's OSHA enforcement database, accessed via the DOL public data API. Records are updated daily. We strive for accuracy, but errors in data processing or establishment grouping are possible. Penalty amounts reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conference, settlement, or judicial review. Company pages group inspection records by normalized employer name, city, and state as reported in OSHA records. That grouping is deterministic and non-fuzzy, but it is not a universal legal-entity identifier. If you believe any record is inaccurate, please report it and we will investigate. This product uses the DOL Data API but is not endorsed or certified by the DOL. For official and authoritative records, visit osha.gov.