Skip to content
SafetyRecord logoSafetyRecord
FRANCIS MELVIN, INC.
$4,700
penalties
25
viol.
2
insp.

FRANCIS MELVIN, INC.

985 PROGRESSIVE AVE., MEDFORD, WI 54451NAICS 237110 Water and Sewer Line and Related Structures Construction

Inspections
2
Aug 2004 to Apr 2024 · 2 safety, 0 health
Violations
25
across 2 inspections
Penalties on record
$4,700
latest amounts in DOL records
By classification
Serious 18Willful 0Repeat 0Other 7

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Apr 4, 2024Planned (H) · Partial scope, Safety#347395394$01 viol.

Inspection #347395394

Dates

Opened
Apr 4, 2024
Closing Conference Date
Apr 4, 2024
Final Order
Jul 26, 2024
Closed
Aug 14, 2024

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
36

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
985 Progressive Ave., Medford, WI 54451
Industry
237110 Water and Sewer Line and Related Structures Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.651
Excavations - Specific Excavation Requirements
OSHA citation code: 19260651 B01
Other13$0$0Jul 17, 2024-Jul 26, 2024
Aug 26, 2004Planned (H) · Complete scope, Safety#307038430$4,70024 viol.

Inspection #307038430

Dates

Opened
Aug 26, 2004
Closing Conference Date
Aug 27, 2004
Contested
Oct 22, 2004
Final Order
Jul 6, 2005
Closed
Sep 7, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
34

Violations and Penalties

Total Violations
24
Violation Types
18 serious, 6 other-than-serious
Initial Penalties
$10,250
Penalties on Record
$4,700
Site Address
100 E. Urquhart St., Medford, WI 54451
Industry
327320 Ready-Mix Concrete Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (24 of 24 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.23
OSHA citation code: 19100023 A02
Serious11$1,000$480Aug 6, 2005Oct 22, 2004Jul 6, 2005
01001B1910.27
OSHA citation code: 19100027 D01 II
Serious11$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
010021910.23
OSHA citation code: 19100023 C01
Serious11$750$380Aug 6, 2005Oct 22, 2004Jul 6, 2005
010031910.110
Storage and Handling of Liquefied Petroleum Gases
OSHA citation code: 19100110 D10
Serious11$750$380Aug 6, 2005Oct 22, 2004Jul 6, 2005
010041910.134
Respiratory Protection
OSHA citation code: 19100134 C01
Serious11$750$380Aug 6, 2005Oct 22, 2004Jul 6, 2005
010051910.146
Permit-Required Confined Spaces
OSHA citation code: 19100146 C01
Serious13$750$380Aug 6, 2005Oct 22, 2004Jul 6, 2005
01006A1910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 C04 I
Serious13$1,250$600Aug 6, 2005Oct 22, 2004Jul 6, 2005
01006B1910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 C05 IID
Serious12$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
01006C1910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 C06 I
Serious12$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
01006D1910.147
The control of hazardous energy (lockout/tagout)
OSHA citation code: 19100147 F02 I
Serious11$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
010071910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A01
Serious32$750$380Aug 6, 2005Oct 22, 2004Jul 6, 2005
010081910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 B09
Serious11$750$380Aug 6, 2005Oct 22, 2004Jul 6, 2005
01009A1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 D01
Serious11$750$380Aug 6, 2005Oct 22, 2004Jul 6, 2005
01009B1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 E02 I
Serious11$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
01010A1910.253
Oxygen-Fuel Gas Welding and Cutting
OSHA citation code: 19100253 B02 II
Serious12$1,000$480Aug 6, 2005Oct 22, 2004Jul 6, 2005
01010B1910.253
Oxygen-Fuel Gas Welding and Cutting
OSHA citation code: 19100253 B04 III
Serious12$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
01011A1910.305
Wiring methods, components, and equipment for general use
OSHA citation code: 19100305 B01
Serious22$1,000$480Aug 6, 2005Oct 22, 2004Jul 6, 2005
01011B1910.305
Wiring methods, components, and equipment for general use
OSHA citation code: 19100305 J01 I
Serious11$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
01012A1910.1200
Hazard Communication
OSHA citation code: 19101200 E01
Other11$750$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
01012B1910.1200
Hazard Communication
OSHA citation code: 19101200 G01
Other11$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
01012C1910.1200
Hazard Communication
OSHA citation code: 19101200 G08
Other11$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
020011910.22
OSHA citation code: 19100022 A01
Other11$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
020021910.95
Occupational Noise Exposure
OSHA citation code: 19100095 D01
Other11$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
020031910.242
Hand and Portable Powered Tools and Equipment, General
OSHA citation code: 19100242 B
Other11$0$0Aug 6, 2005Oct 22, 2004Jul 6, 2005
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.147The control of hazardous energy (lockout/tagout)4 citations · $600
1910.1200Hazard Communication3 citations · $0
1910.219Mechanical Power-Transmission Apparatus2 citations · $380

Industry comparison

Violations per inspection
This employer12.5
Industry average1.6
Penalties per inspection
This employer$2,350
Industry average$2,262

Heavy and Civil Engineering Construction, 69,151 employers with OSHA inspections. Arithmetic from DOL records.

Other inspected employers in MEDFORD, WI

All employers in MEDFORD →