Skip to content
SafetyRecord logoSafetyRecord
GILBERTO RAMIREZ CRUZ
$730
penalties
8
viol.
3
insp.

GILBERTO RAMIREZ CRUZ

AVE. 5 DE DICIEMBRE # 110, SABANA GRANDE, PR 00637NAICS 236220 Commercial and Institutional Building Construction

Inspections
3
Aug 2015 to Sep 2026 · 3 safety, 0 health
Violations
8
across 3 inspections
Penalties on record
$730
latest amounts in DOL records
By classification
Serious 4Willful 0Repeat 0Other 4

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Sep 3, 2026OpenReferral (C) · Partial scope, Safety#349151290$00 viol.

Inspection #349151290

Dates

Opened
Sep 3, 2026
Closing Conference Date
Sep 3, 2026
Closed
Open

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
10
Related Activity
1 referral

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
#110 Avenida 21 De Diciembre, Sabana Grande, PR 00637
Industry
236220 Commercial and Institutional Building Construction

Referral Inspection: This inspection record is categorized as a referral inspection in the DOL OSHA enforcement data. Referral inspections can result from another agency, another OSHA activity, or another source referring a potential hazard to OSHA.

OSHA's inspection record does not currently show a close date for this case. Citation-level records on this page may still show later contest, penalty, or failure-to-abate activity.
Mar 16, 2016Planned (H) · Complete scope, Safety#341328573$4005 viol.

Inspection #341328573

Dates

Opened
Mar 16, 2016
Closing Conference Date
Mar 16, 2016
Final Order
Jun 28, 2016
Closed
Jun 28, 2016

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
5

Violations and Penalties

Total Violations
5
Violation Types
2 serious, 3 other-than-serious
Initial Penalties
$800
Penalties on Record
$400
Site Address
Ave. 5 De Diciembre # 110, Sabana Grande, PR 00637
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 G01 VI
Serious14$800$400-Jun 28, 2016
01001B1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 B05 II
Serious13$0$0Jun 8, 2016-Jun 28, 2016
020011926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 H01
Other13$0$0Jun 8, 2016-Jun 28, 2016
020021926.452
Additional Requirements for Specific Scaffold Types
OSHA citation code: 19260452 A09
Other43$0$0Jun 8, 2016-Jun 28, 2016
020031926.1052
Stairways (Construction)
OSHA citation code: 19261052 C01 I
Other44$0$0Jun 8, 2016-Jun 28, 2016
Aug 24, 2015Planned (H) · Complete scope, Safety#340870716$3303 viol.

Inspection #340870716

Dates

Opened
Aug 24, 2015
Closing Conference Date
Aug 24, 2015
Final Order
Oct 20, 2015
Closed
Oct 21, 2015

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
2

Violations and Penalties

Total Violations
3
Violation Types
2 serious, 1 other-than-serious
Initial Penalties
$525
Penalties on Record
$330
Site Address
Ave. 21 De Diciembre # 110, Sabana Grande, PR 00637
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.501
Fall Protection - Duty to Have Fall Protection
OSHA citation code: 19260501 B01
Serious11$300$180-Oct 20, 2015
010021926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 II
Serious11$225$150Oct 8, 2015-Oct 20, 2015
020011926.503
Fall Protection - Training Requirements
OSHA citation code: 19260503 A01
Other11$0$0Oct 14, 2015-Oct 20, 2015
Inspections 1 to 3 of 3, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.451Scaffolding - General Requirements3 citations · $400
1926.404Electrical - Wiring Design and Protection (Construction)1 citation · $150
1926.452Additional Requirements for Specific Scaffold Types1 citation · $0

Industry comparison

Violations per inspection
This employer2.7
Industry average1.5
Penalties per inspection
This employer$243
Industry average$1,286

Construction of Buildings, 202,676 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: nonresidential building construction reported 1.9 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 6.8%; NAICS 2362 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in SABANA GRANDE, PR

All employers in SABANA GRANDE →