GLASS & GLAZING LTD
200 BLOCK OF S 11TH ST, Philadelphia, PA 19106 · NAICS 238150 Glass and Glazing Contractors
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jul 18, 1988#100936368Jul 18, 1988Unprogrammed Related (G) · Complete scope, Safety#100936368$00 viol.0 violations$0 in penalties
Inspection #100936368
Dates
- Opened
- Jul 18, 1988
- Closing Conference Date
- Jul 22, 1988
- Closed
- Jul 25, 1988
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 6
- Related Activity
- 1 referral
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 3223 N. Broad Street, Philadelphia, PA 19140
- Industry
- 238150 Glass and Glazing Contractors
Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Sep 12, 1983#12636015Sep 12, 1983Planned (H) · Complete scope, Safety#12636015$803 viol.3 violations$80 in penalties
Inspection #12636015
Dates
- Opened
- Sep 12, 1983
- Closing Conference Date
- Sep 13, 1983
- Closed
- Mar 22, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 9
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 2 serious, 1 other-than-serious
- Initial Penalties
- $80
- Penalties on Record
- $80
- Site Address
- 6320 Chew Street, Philadelphia, PA 19144
- Industry
- 238150 Glass and Glazing Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.400 Introduction (Electrical - Construction) OSHA citation code: 19260400 A 021007 | Serious | 1 | - | $80 | $80 | Oct 3, 1983 | - | - |
| 01001B | 1926.400 Introduction (Electrical - Construction) OSHA citation code: 19260400 H01 | Serious | 1 | - | $0 | $0 | Oct 3, 1983 | - | - |
| 02001 | 1903.2 Posting of Notices; Availability of the Act, Regulations and Applicable Standards OSHA citation code: 19030002 A01 | Other | 1 | - | $0 | $0 | Sep 26, 1983 | - | - |
Aug 15, 1983#12768859Aug 15, 1983Planned (H) · Complete scope, Safety#12768859$1006 viol.6 violations$100 in penalties
Inspection #12768859
Dates
- Opened
- Aug 15, 1983
- Closing Conference Date
- Aug 16, 1983
- Closed
- Oct 26, 1983
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 2
Violations and Penalties
- Total Violations
- 6
- Violation Types
- 3 serious, 3 other-than-serious
- Initial Penalties
- $100
- Penalties on Record
- $100
- Site Address
- Executive House City Line & Ov, Philadelphia, PA 19131
- Industry
- 238150 Glass and Glazing Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (6 of 6 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 D | Serious | 3 | - | $100 | $100 | Sep 8, 1983 | - | - |
| 01001B | 1926.500 Scope, application, and definitions applicable to this subpart OSHA citation code: 19260500 F01 | Serious | 3 | - | $0 | $0 | Sep 8, 1983 | - | - |
| 01001C | 1926.56 Illumination OSHA citation code: 19260056 A | Serious | 3 | - | $0 | $0 | Sep 8, 1983 | - | - |
| 02001 | 1926.300 General requirements OSHA citation code: 19260300 B02 | Other | 1 | - | $0 | $0 | Sep 8, 1983 | - | - |
| 02002 | 1926.400 Introduction (Electrical - Construction) OSHA citation code: 19260400 H01 | Other | 1 | - | $0 | $0 | Sep 8, 1983 | - | - |
| 02003 | 1926.302 Power-Operated Hand Tools OSHA citation code: 19260302 E01 | Other | 1 | - | $0 | $0 | Sep 8, 1983 | - | - |
Aug 12, 1983#12758603Aug 12, 1983Planned (H) · Partial scope, Safety#12758603$00 viol.0 violations$0 in penalties
Inspection #12758603
Dates
- Opened
- Aug 12, 1983
- Closing Conference Date
- Aug 12, 1983
- Closed
- Oct 4, 1983
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 4
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 200 Block Of S 11th St, Philadelphia, PA 19106
- Industry
- 238150 Glass and Glazing Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
4 inspections, 1983 to 1988. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
Specialty Trade Contractors, 552,053 employers with OSHA inspections. Arithmetic from DOL records.