Skip to content
SafetyRecord logoSafetyRecord
HAYES & LUNSFORD ELECTRIC
$875
penalties
3
viol.
3
insp.

HAYES & LUNSFORD ELECTRIC

810B WEST FARIS RD., Greenville, SC 29605

Inspections
3
Nov 1993 to May 2005 · 3 safety, 0 health
Violations
3
across 3 inspections
Penalties on record
$875
latest amounts in DOL records
By classification
Serious 1Willful 0Repeat 0Other 2

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

May 4, 2005Planned (H) · Complete scope, Safety#308240456$01 viol.

Inspection #308240456

Dates

Opened
May 4, 2005
Closing Conference Date
May 4, 2005
Closed
Jun 17, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
4

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1125 Woodruff Road, Greenville, SC 29615
Industry
238210 Electrical Contractors and Other Wiring Installation Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.1200
Hazard Communication
OSHA citation code: 19101200 E01
Other14$0$0Jun 13, 2005--
Jun 9, 1994Planned (H) · Complete scope, Safety#124663709$00 viol.

Inspection #124663709

Dates

Opened
Jun 9, 1994
Closing Conference Date
Jun 9, 1994
Closed
Jun 17, 1994

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
6

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
810b West Faris Rd., Greenville, SC 29605
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Nov 2, 1993Planned (H) · Complete scope, Safety#124651555$8752 viol.

Inspection #124651555

Dates

Opened
Nov 2, 1993
Closing Conference Date
Nov 2, 1993
Closed
Dec 1, 1993

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
2
Violation Types
1 serious, 1 other-than-serious
Initial Penalties
$875
Penalties on Record
$875
Site Address
1810 W. Faris Rd., Greenville, SC 29605
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.28
Personal Protective Equipment
OSHA citation code: 19260028 A
Serious11$875$875Nov 24, 1993--
020011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 II
Other21$0$0Nov 24, 1993--
Inspections 1 to 3 of 3, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.1200Hazard Communication1 citation · $0
1926.28Personal Protective Equipment1 citation · $875
1926.404Electrical - Wiring Design and Protection (Construction)1 citation · $0

Industry comparison

BLS 2024 survey: electrical contractors and other wiring installation contractors reported 1.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 5.7%; NAICS 23821 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in Greenville, SC

All employers in Greenville →