70 MARYLAND AVENUE, JERSEY SHORE, PA 17740
NAICS 331221: Rolled Steel Shape Manufacturing - Records current through Jul 27, 2023
JERSEY SHORE STEEL COMPANY has had 11 OSHA inspections since Aug 10, 1973, resulting in 43 violations and $36,290 in penalties on record.
As reported in the U.S. Department of Labor OSHA enforcement database. Having inspection records is common for businesses in regulated industries. Penalty amounts may differ from final amounts after settlement or judicial review.
Data sourced from the U.S. Department of Labor OSHA enforcement database. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conferences, settlements, or adjudication. Having an inspection record is common in regulated industries and does not by itself indicate unsafe conditions. This is not an official OSHA resource and does not constitute legal advice.
| Standard | Citations | Penalties |
|---|---|---|
| 1910.179Overhead and Gantry Cranes | 5 | $713 |
| 1910.23Ladders | 4 | $2,637 |
| 1910.212General Requirements for All Machines (Machine Guarding) | 4 | $16,789 |
| 1910.180Crawler Locomotive and Truck Cranes | 3 | $0 |
| 1910.134Respiratory Protection | 3 | $763 |
| 1910.219Mechanical Power-Transmission Apparatus | 3 | $1,790 |
| 1910.303Electrical - General Requirements | 3 | $2,175 |
| 1910.146Permit-Required Confined Spaces | 3 | $562 |
| 1910.305Electrical - Wiring Methods, Components, and Equipment | 3 | $1,500 |
| 1910.1200Hazard Communication | 2 | $0 |
| ID | Opened | Type | Scope | Viol. | Penalties |
|---|---|---|---|---|---|
| #346866957 | Jul 27, 2023 | Planned | Complete | 1 | $1,000 |
| #345014856 | Nov 9, 2020 | Referral | Partial | 2 | $13,517 |
| #344201504 | Aug 2, 2019 | Referral | Partial | 1 | $5,072 |
| #341606887 |
Incident investigation summaries linked to this employer through OSHA accident and injury enforcement data.
Employee crushes and amputates hand and lower portion arm wh
View inspection #345014856 →Employee amputates fingertip when caught in machine nip poin
View inspection #344201504 →Source: U.S. Department of Labor OSHA incident investigation data. See data reference for matching and methodology details.
OSHA collected 10 air monitoring samples across 1 inspection, testing for 2 substances. These include personal breathing zone and area air monitoring samples collected during OSHA inspections. View individual inspection pages for detailed sample results and exposure measurements.
Source: OSHA chemical exposure sampling data (OSHA Information System). Includes personal and area air monitoring samples only. Linked via inspection number (exact government key).
Metal fabrication and machinery manufacturing operations are most frequently cited for machine guarding deficiencies (29 CFR 1910.212), inadequate lockout/tagout procedures for energy control (29 CFR 1910.147), electrical hazards (29 CFR 1910.303), and hearing conservation violations (29 CFR 1910.95). Welding operations face additional citations under 29 CFR 1910.252 for ventilation and fire prevention.
Data Source and Methodology
Data synced dailyData on this page comes from the U.S. Department of Labor's OSHA enforcement database, accessed via the DOL public data API. Records are updated daily. We strive for accuracy, but errors in data processing or establishment matching are possible. Penalty amounts reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts after informal conference, settlement, or judicial review. Establishment matching is based on employer name and location as reported in inspection records; some establishments may appear under multiple name variations. If you believe any record is inaccurate, please report it and we will investigate. This product uses the DOL Data API but is not endorsed or certified by the DOL. For official and authoritative records, visit osha.gov.
| Jul 7, 2016 |
| Planned |
| Partial |
| 2 |
| $3,066 |
| #315799742 | Feb 1, 2012 | Follow-Up | Partial | 0 | $0 |
| #314162496 | Apr 13, 2011 | Planned | Complete | 10 | $4,950 |
| #314161464 | Feb 16, 2011 | Planned | Partial | 0 | $0 |
| #312294309 | Dec 2, 2009 | Planned | Partial | 0 | $0 |
| #310226386 | Jan 29, 2007 | Planned | Complete | 5 | $1,125 |
| #310226360 | Jan 29, 2007 | Planned | Complete | 16 | $7,315 |
| #12943106 | Aug 10, 1973 | Planned | Complete | 6 | $245 |