Skip to content
SafetyRecord logoSafetyRecord
JIM JOHNSON CEMENT CONTRACTORS
$0
penalties
3
viol.
3
insp.

JIM JOHNSON CEMENT CONTRACTORS

9711 N. NEVADA, SPOKANE, WA 99218NAICS 238110 Poured Concrete Foundation and Structure Contractors

Inspections
3
Apr 2010 to Sep 2011 · 3 safety, 0 health
Violations
3
across 3 inspections
Penalties on record
$0
latest amounts in DOL records
By classification
Serious 0Willful 0Repeat 0Other 3

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Sep 29, 2011Programmed Related (I) · Complete scope, Safety#315201830$01 viol.

Inspection #315201830

Dates

Opened
Sep 29, 2011
Closing Conference Date
Sep 29, 2011
Closed
Dec 5, 2011

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
12

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
9711 N. Nevada, Spokane, WA 99218
Industry
238110 Poured Concrete Foundation and Structure Contractors

Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011550035504Other112$0$0Dec 5, 2011--
Sep 29, 2010Programmed Related (I) · Complete scope, Safety#314562307$01 viol.

Inspection #314562307

Dates

Opened
Sep 29, 2010
Closing Conference Date
Sep 29, 2010
Closed
Dec 29, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
2

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
8510 W. Sr #2, Spokane, WA 99224
Industry
238110 Poured Concrete Foundation and Structure Contractors

Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011550.210Other11$0$0Nov 27, 2010--
Apr 9, 2010Programmed Related (I) · Partial scope, Safety#314252636$01 viol.

Inspection #314252636

Dates

Opened
Apr 9, 2010
Closing Conference Date
Apr 9, 2010
Closed
Jun 21, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
10

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
2020 E. 29th Street, Spokane, WA 99218
Industry
238110 Poured Concrete Foundation and Structure Contractors

Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011550012002Other110$0$0May 31, 2010--
Inspections 1 to 3 of 3, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

15500120021 citation · $0
1550.2101 citation · $0
15500355041 citation · $0

Industry comparison

Violations per inspection
This employer1.0
Industry average2.1
Penalties per inspection
This employer$0
Industry average$2,541

Specialty Trade Contractors, 558,619 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: poured concrete foundation and structure contractors reported 2.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 10.7%; NAICS 23811 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in SPOKANE, WA

All employers in SPOKANE →