Skip to content
SafetyRecord logoSafetyRecord
JOSE TINAJERO
$7,150
penalties
7
viol.
1
insp.

JOSE TINAJERO

2528 PARKWAY, PIGEON FORGE, TN 37863NAICS 238130 Framing Contractors

Inspections
1
Oct 2018 to Oct 2018 · 1 safety, 0 health
Violations
7
across 1 inspection
Penalties on record
$7,150
latest amounts in DOL records
By classification
Serious 6Willful 0Repeat 0Other 1

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Oct 9, 2018Final Order RecordedUnprogrammed Related (G) · Complete scope, Safety#343524922$7,1507 viol.

Inspection #343524922

Dates

Opened
Oct 9, 2018
Closing Conference Date
Oct 9, 2018
Final Order
Nov 14, 2019
Closed
No close date in inspection feed

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3
Related Activity
1 referral

Violations and Penalties

Total Violations
7
Violation Types
6 serious, 1 other-than-serious
Initial Penalties
$7,150
Penalties on Record
$7,150
Site Address
2528 Parkway, Pigeon Forge, TN 37863
Industry
238130 Framing Contractors

Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

OSHA's inspection feed still shows no close date for this record. However, the citation records tied to this inspection show final orders recorded through Nov 14, 2019.

Violations

Violation list (7 of 7 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.100
Head Protection (Construction)
OSHA citation code: 19260100 A
Serious12$1,200$1,200Mar 11, 2019-Aug 14, 2019
010021926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 B01 I
Serious12$1,200$1,200Mar 11, 2019-Aug 14, 2019
010031926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 E01
Serious12$1,050$1,050Mar 11, 2019-Aug 14, 2019
010041926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 F07
Serious12$1,050$1,050Mar 11, 2019-Aug 14, 2019
010051926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 G01
Serious12$1,200$1,200Mar 11, 2019-Aug 14, 2019
010061926.454
Scaffolding - Training
OSHA citation code: 19260454 A01
Serious12$1,050$1,050Apr 5, 2019-Aug 14, 2019
02001TDLWD
OSHA citation code: TDLWD RULE 800-01-04-.23(4)(A)
Other11$400$400Nov 8, 2019-Nov 14, 2019
Inspections 1 to 1 of 1, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.451Scaffolding - General Requirements4 citations · $4,500
1926.100Head Protection (Construction)1 citation · $1,200
1926.454Scaffolding - Training1 citation · $1,050

Industry comparison

Violations per inspection
This employer7.0
Industry average2.1
Penalties per inspection
This employer$7,150
Industry average$2,530

Specialty Trade Contractors, 551,694 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: framing contractors reported 4.6 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 9.8%; NAICS 23813 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in PIGEON FORGE, TN

All employers in PIGEON FORGE →