K & J CONTRACTING
3100 NW 5 AVE, MIAMI, FL 33135 · NAICS 238110 Poured Concrete Foundation and Structure Contractors
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Oct 5, 2010#314265851Oct 5, 2010Planned (H) · Partial scope, Safety#314265851$34,2009 viol.9 violations$34,200 in penalties
Inspection #314265851
Dates
- Opened
- Oct 5, 2010
- Closing Conference Date
- Oct 5, 2010
- Closed
- Sep 15, 2014
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 9
- Violation Types
- 5 serious, 2 repeat, 2 other-than-serious
- Initial Penalties
- $34,200
- Penalties on Record
- $34,200
- Site Address
- 9155 Sw 162nd Ave, Miami, FL 33196
- Industry
- 238140 Masonry Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (9 of 9 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.20 General Safety and Health Provisions OSHA citation code: 19260020 B01 | Serious | 1 | 1 | $2,400 | $2,400 | Nov 11, 2010 | - | - |
| 01002 | 1926.100 Head protection OSHA citation code: 19260100 A | Serious | 1 | 1 | $2,400 | $2,400 | Nov 2, 2010 | - | - |
| 01003 | 1926.503 Fall Protection - Training Requirements OSHA citation code: 19260503 A01 | Serious | 1 | 4 | $3,000 | $3,000 | Nov 5, 2010 | - | - |
| 01004 | 1926.701 Concrete and Masonry Construction - General Requirements OSHA citation code: 19260701 B | Serious | 1 | 4 | $2,400 | $2,400 | Nov 2, 2010 | - | - |
| 01005 | 1926.1060 Stairways and Ladders - Training (Construction) OSHA citation code: 19261060 A | Serious | 1 | 4 | $3,000 | $3,000 | Nov 5, 2010 | - | - |
| 02001 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B01 | Repeat | 1 | 4 | $15,000 | $15,000 | Nov 2, 2010 | - | - |
| 02002 | 1926.1053 Ladders (Construction) OSHA citation code: 19261053 B01 | Repeat | 1 | 4 | $6,000 | $6,000 | Nov 2, 2010 | - | - |
| 03001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 F06 | Other | 1 | 2 | $0 | $0 | Nov 2, 2010 | - | - |
| 03002 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 G02 IV | Other | 1 | 2 | $0 | $0 | Nov 2, 2010 | - | - |
Oct 5, 2005#308412295Oct 5, 2005Complaint (B) · Partial scope, Safety#308412295$24,0005 viol.5 violations$24,000 in penalties
Inspection #308412295
Dates
- Opened
- Oct 5, 2005
- Closing Conference Date
- Oct 5, 2005
- Closed
- Jan 1, 2016
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 50
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 5
- Violation Types
- 4 serious, 1 repeat
- Initial Penalties
- $24,000
- Penalties on Record
- $24,000
- Site Address
- Bldg 300 University Village At Univ Of Miami, Miami, FL 33146
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Violations
Violation list (5 of 5 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.20 General Safety and Health Provisions OSHA citation code: 19260020 B02 | Serious | 1 | 2 | $4,000 | $4,000 | Oct 20, 2005 | - | - |
| 01002 | 1926.34 Means of Egress OSHA citation code: 19260034 C | Serious | 2 | 2 | $4,000 | $4,000 | Oct 31, 2005 | - | - |
| 01003 | 1926.102 Eye and face protection OSHA citation code: 19260102 A01 | Serious | 1 | 1 | $4,000 | $4,000 | Oct 20, 2005 | - | - |
| 01004 | 1926.1052 Stairways (Construction) OSHA citation code: 19261052 C01 | Serious | 1 | 2 | $4,000 | $4,000 | Oct 31, 2005 | - | - |
| 02001 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B01 | Repeat | 1 | 2 | $8,000 | $8,000 | Oct 31, 2005 | - | - |
Feb 3, 1999#301881355Feb 3, 1999Programmed Related (I) · Complete scope, Safety#301881355$6,7509 viol.9 violations$6,750 in penalties
Inspection #301881355
Dates
- Opened
- Feb 3, 1999
- Closing Conference Date
- Feb 5, 1999
- Closed
- Jan 3, 2003
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 30
Violations and Penalties
- Total Violations
- 9
- Violation Types
- 7 serious, 2 other-than-serious
- Initial Penalties
- $10,125
- Penalties on Record
- $6,750
- Site Address
- 3100 Nw 5 Ave, Miami, FL 33135
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Violations
Violation list (9 of 9 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.21 Safety Training and Education OSHA citation code: 19260021 B02 | Serious | 1 | 30 | $1,225 | $800 | Apr 20, 1999 | - | - |
| 01001B | 1926.454 OSHA citation code: 19260454 A | Serious | 1 | 20 | $0 | $0 | Apr 20, 1999 | - | - |
| 01002 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 C02 | Serious | 1 | 10 | $2,500 | $1,750 | Mar 16, 1999 | - | - |
| 01003 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 C02 II | Serious | 1 | 10 | $2,500 | $1,750 | Mar 16, 1999 | - | - |
| 01004 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 F07 | Serious | 1 | 2 | $875 | $500 | Mar 16, 1999 | - | - |
| 01005 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 G01 | Serious | 1 | 20 | $2,500 | $1,750 | Mar 10, 1999 | - | - |
| 01006 | 1926.1053 Ladders (Construction) OSHA citation code: 19261053 A11 | Serious | 1 | 20 | $525 | $200 | Mar 10, 1999 | - | - |
| 02001 | 1926.403 Electrical - General Requirements (Construction) OSHA citation code: 19260403 G | Other | 1 | 1 | $0 | $0 | Mar 16, 1999 | - | - |
| 02002 | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 G02 III | Other | 1 | 1 | $0 | $0 | Mar 9, 1999 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
3 inspections, 1999 to 2010. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Standards cited
Industry comparison
Specialty Trade Contractors, 551,927 employers with OSHA inspections. Arithmetic from DOL records.