Skip to content
SafetyRecord logoSafetyRecord
MERRILL MILLWORK INC
$1,531
penalties
16
viol.
6
insp.

MERRILL MILLWORK INC

WEST JACKSON STREET, Merrill, WI 54452NAICS 321911 Wood Window and Door Manufacturing

Inspections
6
Oct 1973 to Jul 2003 · 6 safety, 0 health
Violations
16
across 6 inspections
Penalties on record
$1,531
latest amounts in DOL records
By classification
Serious 12Willful 0Repeat 0Other 4

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Jul 9, 2003Planned (H) · Partial scope, Safety#122016181$3164 viol.

Inspection #122016181

Dates

Opened
Jul 9, 2003
Closing Conference Date
Jul 9, 2003
Closed
Sep 2, 2003

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
25

Violations and Penalties

Total Violations
4
Violation Types
3 serious, 1 other-than-serious
Initial Penalties
$450
Penalties on Record
$316
Site Address
1300 W. Taylor St., Merrill, WI 54452
Industry
321911 Wood Window and Door Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A01
Serious11$225$158Jul 31, 2003--
01002A1910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 H01
Serious11$225$158Jul 31, 2003--
01002B1910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 H04
Serious11$0$0Jul 31, 2003--
020011910.38
OSHA citation code: 19100038 A01
Other125$0$0Aug 29, 2003--
Nov 29, 1994Planned (H) · Complete scope, Safety#122477078$7505 viol.

Inspection #122477078

Dates

Opened
Nov 29, 1994
Closing Conference Date
Nov 29, 1994
Closed
Feb 23, 1995

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
24

Violations and Penalties

Total Violations
5
Violation Types
4 serious, 1 other-than-serious
Initial Penalties
$750
Penalties on Record
$750
Site Address
1111 West Jackson St., Merrill, WI 54452
Industry
321911 Wood Window and Door Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.132
General requirements
OSHA citation code: 19100132 D02
Serious11$300$300Mar 8, 1995--
01001B1910.133
Eye and Face Protection
OSHA citation code: 19100133 A01
Serious11$0$0Mar 8, 1995--
010021910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 H01
Serious11$225$225Mar 8, 1995--
010031910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 R04
Serious11$225$225Mar 8, 1995--
020011910.178
Powered Industrial Trucks
OSHA citation code: 19100178 L
Other11$0$0Mar 8, 1995--
Sep 14, 1989Planned (H) · Complete scope, Safety#103083853$4406 viol.

Inspection #103083853

Dates

Opened
Sep 14, 1989
Closing Conference Date
Sep 14, 1989
Closed
Oct 23, 1989

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
21

Violations and Penalties

Total Violations
6
Violation Types
5 serious, 1 other-than-serious
Initial Penalties
$440
Penalties on Record
$440
Site Address
1111 West Jackson St., Merrill, WI 54452
Industry
321911 Wood Window and Door Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (6 of 6 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.133
Eye and Face Protection
OSHA citation code: 19100133 A01
Serious16$160$160Nov 20, 1989--
01002A1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 D01
Serious22$120$120Oct 31, 1989--
01002B1910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 E03 I
Serious22$0$0Oct 31, 1989--
010031910.304
Wiring design and protection
OSHA citation code: 19100304 F04
Serious22$80$80Oct 31, 1989--
010041910.1200
Hazard Communication
OSHA citation code: 19101200 E01
Serious120$80$80Oct 31, 1989--
020011910.213
Woodworking Machinery Requirements
OSHA citation code: 19100213 C03
Other11$0$0Oct 31, 1989--
Aug 5, 1982Planned (H) · Records Only scope, Safety#14389993$00 viol.

Inspection #14389993

Dates

Opened
Aug 5, 1982
Closing Conference Date
Aug 5, 1982
Closed
Aug 9, 1982

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
16

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
West Jackson St, Merrill, WI 54452
Industry
321911 Wood Window and Door Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Aug 9, 1979Planned (H) · Complete scope, Safety#14387815$00 viol.

Inspection #14387815

Dates

Opened
Aug 9, 1979
Closing Conference Date
Aug 9, 1979
Closed
Mar 10, 1984

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
16

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
West Jackson Street, Merrill, WI 54452
Industry
321911 Wood Window and Door Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Oct 16, 1973Planned (H) · Complete scope, Safety#15446545$251 viol.

Inspection #15446545

Dates

Opened
Oct 16, 1973
Closing Conference Date
Oct 16, 1973
Closed
Mar 10, 1984

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Not displayed
Number of Employees
7

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$25
Penalties on Record
$25
Site Address
W Jackson St, Merrill, WI 54452
Industry
321911 Wood Window and Door Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.309
OSHA citation code: 19100309 A 025045
Other1-$25$25Nov 7, 1973--
Inspections 1 to 6 of 6, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.213Woodworking Machinery Requirements5 citations · $608
1910.133Eye and Face Protection2 citations · $160
1910.219Mechanical Power-Transmission Apparatus2 citations · $120

Industry comparison

Violations per inspection
This employer2.7
Industry average3.4
Penalties per inspection
This employer$255
Industry average$2,531

Wood Product Manufacturing, 17,986 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: wood window and door manufacturing reported 3.3 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 8.1%). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in Merrill, WI

All employers in Merrill →