MILLER BUILDING SYSTEMS LLC
LOT 708 COLE LANE, MAHOMET, IL 61853 · NAICS 238130 Framing Contractors
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
May 2, 2024#347456022May 2, 2024Planned (H) · Partial scope, Safety#347456022$00 viol.0 violations$0 in penalties
Inspection #347456022
Dates
- Opened
- May 2, 2024
- Closing Conference Date
- May 2, 2024
- Closed
- Sep 8, 2026
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 4
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1107 Morningside Lane, Mahomet, IL 61853
- Industry
- 238130 Framing Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Jan 11, 2024#347208324Jan 11, 2024Planned (H) · Partial scope, Safety#347208324$00 viol.0 violations$0 in penalties
Inspection #347208324
Dates
- Opened
- Jan 11, 2024
- Closing Conference Date
- Jan 11, 2024
- Closed
- Sep 8, 2026
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 5
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Lot 708 Cole Lane, Mahomet, IL 61853
- Industry
- 238130 Framing Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Nov 29, 2023#347131617Nov 29, 2023Planned (H) · Partial scope, Safety#347131617$62,5001 viol.1 violation$62,500 in penalties
Inspection #347131617
Dates
- Opened
- Nov 29, 2023
- Closing Conference Date
- Nov 29, 2023
- Contested
- Jun 5, 2024
- Final Order
- Oct 14, 2025
- Closed
- Sep 8, 2026
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 5
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 willful
- Initial Penalties
- $88,728
- Penalties on Record
- $62,500
- Site Address
- Corner Of Briarwood Lane And Ravenwood Drive, Mahomet, IL 61853
- Industry
- 238130 Framing Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B13 | Willful | 1 | 2 | $88,728 | $62,500 | May 28, 2024 | Jun 5, 2024 | Oct 14, 2025 |
Nov 3, 2023#347083057Nov 3, 2023Planned (H) · Partial scope, Safety#347083057$00 viol.0 violations$0 in penalties
Inspection #347083057
Dates
- Opened
- Nov 3, 2023
- Closing Conference Date
- Nov 3, 2023
- Closed
- Sep 8, 2026
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 5
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- End Of S. Roberto Road, Mahomet, IL 61853
- Industry
- 238130 Framing Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Oct 23, 2023#347053126Oct 23, 2023Planned (H) · Partial scope, Safety#347053126$00 viol.0 violations$0 in penalties
Inspection #347053126
Dates
- Opened
- Oct 23, 2023
- Closing Conference Date
- Oct 23, 2023
- Closed
- Sep 8, 2026
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 4
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1310 Ravenwood Drive, Mahomet, IL 61853
- Industry
- 238130 Framing Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Jan 28, 2020#344587779Jan 28, 2020Complaint (B) · Partial scope, Safety#344587779$00 viol.0 violations$0 in penalties
Inspection #344587779
Dates
- Opened
- Jan 28, 2020
- Closing Conference Date
- Jan 28, 2020
- Closed
- Jan 28, 2020
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 5
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Corner Of E. Oak Street And S. Mcdougal, Mahomet, IL 61853
- Industry
- 238130 Framing Contractors
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
6 inspections, 2020 to 2024. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
Specialty Trade Contractors, 558,619 employers with OSHA inspections. Arithmetic from DOL records.
BLS 2024 survey: framing contractors reported 4.6 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 9.8%; NAICS 23813 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source