Skip to content
SafetyRecord logoSafetyRecord
MINNEAPOLIS SHEET METAL WORKS
$2,751
penalties
50
viol.
14
insp.

MINNEAPOLIS SHEET METAL WORKS

9 8TH AVE SW, New Brighton, MN 55112

Inspections
14
Jan 1974 to May 2013 · 11 safety, 3 health
Violations
50
across 14 inspections
Penalties on record
$2,751
latest amounts in DOL records
By classification
Serious 15Willful 0Repeat 0Other 35

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

May 29, 2013Referral (C) · Partial scope, Health#317150944$1,1254 viol.

Inspection #317150944

Dates

Opened
May 29, 2013
Closing Conference Date
May 29, 2013
Closed
Jul 15, 2013

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
12
Related Activity
1 referral

Violations and Penalties

Total Violations
4
Violation Types
3 serious, 1 other-than-serious
Initial Penalties
$1,125
Penalties on Record
$1,125
Site Address
9 8th Ave Sw, New Brighton, MN 55112
Industry
332322 Sheet Metal Work Manufacturing

Referral Inspection: This inspection record is categorized as a referral inspection in the DOL OSHA enforcement data. Referral inspections can result from another agency, another OSHA activity, or another source referring a potential hazard to OSHA.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.1026
Chromium (VI)
OSHA citation code: 19101026 D01
Serious17$375$375Jul 4, 2013--
010021910.1026
Chromium (VI)
OSHA citation code: 19101026 L01
Serious17$375$375Jul 4, 2013--
010035206070001
OSHA citation code: 5206070001 G
Serious17$375$375Jul 4, 2013--
020015206070001
OSHA citation code: 5206070001 B
Other17$0$0Jul 4, 2013--
May 22, 2013Planned (H) · Complete scope, Safety#317150837$00 viol.

Inspection #317150837

Dates

Opened
May 22, 2013
Closing Conference Date
May 22, 2013
Closed
May 30, 2013

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
12

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
9 8th Ave Sw, New Brighton, MN 55112
Industry
332322 Sheet Metal Work Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Jul 19, 2010Planned (H) · Complete scope, Safety#314687807$00 viol.

Inspection #314687807

Dates

Opened
Jul 19, 2010
Closing Conference Date
Jul 19, 2010
Closed
Aug 2, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
11

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
9 8th Ave Sw, New Brighton, MN 55112
Industry
332322 Sheet Metal Work Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Aug 5, 2005Planned (H) · Complete scope, Health#309327427$701 viol.

Inspection #309327427

Dates

Opened
Aug 5, 2005
Closing Conference Date
Aug 10, 2005
Closed
Sep 15, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
11

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$100
Penalties on Record
$70
Site Address
9 8th Ave Sw, New Brighton, MN 55112
Industry
332322 Sheet Metal Work Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010015205120003Other19$100$70Sep 12, 2005--
May 5, 2003Planned (H) · Complete scope, Safety#306288473$2272 viol.

Inspection #306288473

Dates

Opened
May 5, 2003
Closing Conference Date
May 9, 2003
Closed
Aug 14, 2003

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
11

Violations and Penalties

Total Violations
2
Violation Types
1 serious, 1 other-than-serious
Initial Penalties
$325
Penalties on Record
$227
Site Address
9 8th Ave. Sw, New Brighton, MN 55112
Industry
332322 Sheet Metal Work Manufacturing

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A02
Serious21$225$157Jun 20, 2003--
020011910.23
OSHA citation code: 19100023 D01 III
Other11$100$70May 27, 2003--
Oct 16, 2000Planned (H) · Complete scope, Safety#303886493$7527 viol.

Inspection #303886493

Dates

Opened
Oct 16, 2000
Closing Conference Date
Oct 19, 2000
Closed
Feb 28, 2001

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
18

Violations and Penalties

Total Violations
7
Violation Types
6 serious, 1 other-than-serious
Initial Penalties
$1,075
Penalties on Record
$752
Site Address
9 8th Ave. Sw, New Brighton, MN 55112
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 7 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001182065308Serious118$0$0Nov 27, 2000--
01002A1910.212
General Requirements for All Machines (Machine Guarding)
OSHA citation code: 19100212 A03 II
Serious22$300$210Feb 16, 2001--
01002B5205.870Serious11$0$0Jan 5, 2001--
010031910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 A04
Serious11$225$157Nov 2, 2000--
010041910.304
Wiring design and protection
OSHA citation code: 19100304 A02
Serious21$225$157Nov 2, 2000--

Showing the 5 violations listed first by citation identifier. This inspection has 7 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Oct 16, 2000Planned (H) · Complete scope, Health#303886485$1051 viol.

Inspection #303886485

Dates

Opened
Oct 16, 2000
Closing Conference Date
Oct 16, 2000
Closed
Dec 8, 2000

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
18

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$150
Penalties on Record
$105
Site Address
9 8th Ave. Sw, New Brighton, MN 55112
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010015205011601Other113$150$105Dec 7, 2000--
Mar 23, 1994Planned (H) · Complete scope, Safety#120420823$03 viol.

Inspection #120420823

Dates

Opened
Mar 23, 1994
Closing Conference Date
Mar 23, 1994
Closed
Aug 3, 1994

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
14

Violations and Penalties

Total Violations
3
Violation Types
3 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
9 8th Ave Sw, New Brighton, MN 55112
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B05 IV
Other11$0$0Jun 21, 1994--
010021910.134
Respiratory Protection
OSHA citation code: 19100134 A02
Other11$0$0Jun 21, 1994--
010035205067502Other31$0$0Jun 21, 1994--
Jul 2, 1991Planned (H) · Complete scope, Safety#111677993$06 viol.

Inspection #111677993

Dates

Opened
Jul 2, 1991
Closing Conference Date
Jul 2, 1991
Closed
Aug 5, 1991

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
15

Violations and Penalties

Total Violations
6
Violation Types
6 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
9 8th Ave Sw, New Brighton, MN 55112
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 6 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010015205070003Other11$0$0Aug 1, 1991--
010021910.106
OSHA citation code: 19100106 D04 V
Other11$0$0Aug 5, 1991--
010031910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 B05 I
Other11$0$0Oct 28, 1991--
010041910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 G01
Other11$0$0Aug 1, 1991--
010051910.107
Spray Finishing Using Flammable and Combustible Materials
OSHA citation code: 19100107 G02
Other11$0$0Aug 1, 1991--

Showing the 5 violations listed first by citation identifier. This inspection has 6 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Aug 26, 1985Follow-Up (F) · Partial scope, Safety#2890242$00 viol.

Inspection #2890242

Dates

Opened
Aug 26, 1985
Closing Conference Date
Aug 26, 1985
Closed
Feb 10, 1986

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
23

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
9 8th Ave Sw, New Brighton, MN 55112
Industry
Not classified in OSHA's inspection record.

Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.

Inspections 1 to 10 of 14, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.212General Requirements for All Machines (Machine Guarding)7 citations · $616
1910.134Respiratory Protection4 citations · $0
1910.107Spray Finishing Using Flammable and Combustible Materials4 citations · $0

Industry comparison

BLS 2024 survey: sheet metal work manufacturing reported 3.3 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 9.4%). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in New Brighton, MN

All employers in New Brighton →