Skip to content
SafetyRecord logoSafetyRecord
RELIANCE MECHANICAL CORP.
$6,550
penalties
32
viol.
21
insp.

RELIANCE MECHANICAL CORP.

UNIVERSITY HOSPITAL, 2065 ADELBERT ROAD, CLEVELAND, OH 44135NAICS 238210 Electrical Contractors and Other Wiring Installation Contractors

Inspections
21
May 1977 to Dec 2007 · 19 safety, 2 health
Violations
32
across 21 inspections
Penalties on record
$6,550
latest amounts in DOL records
By classification
Serious 17Willful 0Repeat 0Other 15

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

May 24, 1977Planned (H) · Partial scope, Safety#214776403$01 viol.

Inspection #214776403

Dates

Opened
May 24, 1977
Closing Conference Date
May 25, 1977
Closed
Jul 28, 1977

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Yes
Number of Employees
82

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Cleveland International Airpor, Cleveland, OH 44135
Industry
238210 Electrical Contractors and Other Wiring Installation Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.350
Gas Welding and Cutting
OSHA citation code: 19260350 A01
Other1-$0$0Jun 4, 1977--
Inspections 21 to 21 of 21, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.350Gas Welding and Cutting7 citations · $560
1926.404Electrical - Wiring Design and Protection (Construction)3 citations · $420
1926.602Material Handling Equipment2 citations · $200

Industry comparison

Violations per inspection
This employer1.5
Industry average2.1
Penalties per inspection
This employer$312
Industry average$2,538

Specialty Trade Contractors, 559,510 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: electrical contractors and other wiring installation contractors reported 1.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 5.7%; NAICS 23821 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in CLEVELAND, OH

All employers in CLEVELAND →