Skip to content
SafetyRecord logoSafetyRecord
ROBERTO LICEA/ RCI CONSTRUCTION, LLC
$975
penalties
14
viol.
1
insp.

ROBERTO LICEA/ RCI CONSTRUCTION, LLC

8120 E. R.L. THORNTON FWY., DALLAS, TX 75228NAICS 238130 Framing Contractors

Inspections
1
Dec 2005 to Dec 2005 · 1 safety, 0 health
Violations
14
across 1 inspection
Penalties on record
$975
latest amounts in DOL records
By classification
Serious 12Willful 0Repeat 0Other 2

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Dec 19, 2005Planned (H) · Partial scope, Safety#307493205$97514 viol.

Inspection #307493205

Dates

Opened
Dec 19, 2005
Closing Conference Date
Dec 19, 2005
Closed
Aug 29, 2006

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
10

Violations and Penalties

Total Violations
14
Violation Types
12 serious, 2 other-than-serious
Initial Penalties
$3,000
Penalties on Record
$975
Site Address
8120 E. R.l. Thornton Fwy., Dallas, TX 75228
Industry
238130 Framing Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (14 of 14 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1926.307
Mechanical Power-Transmission Apparatus
OSHA citation code: 19260307 D01
Other16$450$0Apr 17, 2006--
01001B1926.307
Mechanical Power-Transmission Apparatus
OSHA citation code: 19260307 E01 I
Other16$0$0Apr 17, 2006--
01002A1926.403
Electrical - General Requirements (Construction)
OSHA citation code: 19260403 A
Serious16$450$225Apr 17, 2006--
01002B1926.403
Electrical - General Requirements (Construction)
OSHA citation code: 19260403 D01
Serious16$0$0Apr 17, 2006--
01002C1926.403
Electrical - General Requirements (Construction)
OSHA citation code: 19260403 I02 I
Serious16$0$0Apr 17, 2006--
01002D1926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 G02 III
Serious16$0$0Apr 17, 2006--
01003A1926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 A02
Serious16$450$225Apr 17, 2006--
01003B1926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F06
Serious16$0$0Apr 17, 2006--
01003C1926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 A02 III
Serious16$0$0Apr 17, 2006--
01003D1926.416
Electrical - Safety Requirements (Construction)
OSHA citation code: 19260416 E01
Serious16$0$0Apr 17, 2006--
01004A1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 B02
Serious16$1,050$525Apr 17, 2006--
01004B1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 G01 V
Serious16$0$0Apr 17, 2006--
01005A1926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 G01 III
Serious16$600$0Apr 17, 2006--
01005B1926.1053
Ladders (Construction)
OSHA citation code: 19261053 B01
Serious16$0$0Apr 17, 2006--
Inspections 1 to 1 of 1, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.403Electrical - General Requirements (Construction)3 citations · $225
1926.451Scaffolding - General Requirements3 citations · $525
1926.307Mechanical Power-Transmission Apparatus2 citations · $0

Industry comparison

Violations per inspection
This employer14.0
Industry average2.1
Penalties per inspection
This employer$975
Industry average$2,530

Specialty Trade Contractors, 551,694 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: framing contractors reported 4.6 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 9.8%; NAICS 23813 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in DALLAS, TX

All employers in DALLAS →