Skip to content
SafetyRecord logoSafetyRecord
STEEL PERFORMANCE, INC.
$525
penalties
2
viol.
3
insp.

STEEL PERFORMANCE, INC.

OLD HWY 75, BUTNER FEDERAL CORRECTIONAL INST., BUTNER, NC 27509

Inspections
3
Jul 1994 to Feb 2005 · 2 safety, 1 health
Violations
2
across 3 inspections
Penalties on record
$525
latest amounts in DOL records
By classification
Serious 1Willful 0Repeat 0Other 1

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Feb 23, 2005Planned (H) · Complete scope, Health#300323482$00 viol.

Inspection #300323482

Dates

Opened
Feb 23, 2005
Closing Conference Date
Mar 2, 2005
Closed
Mar 17, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
16

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Old Hwy 75, Butner Federal Correctional Inst., Butner, NC 27509
Industry
238120 Structural Steel and Precast Concrete Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Chemical Exposure Sampling13 substances sampled

Air monitoring samples collected by OSHA during this inspection. Results grouped by substance.

SubstanceSamplesResult RangeUnit
Antimony and Compounds (as Sb)40mg/m³
Beryllium and Beryllium Compounds (as Be)40mg/m³
Cadmium40mg/m³
Chromium, Metal and Insoluble Salts40mg/m³
Cobalt, Metal, Dust and Fume (as Co)40mg/m³
Copper Fume (as Cu)40 - 0.0094547mg/m³
Iron Oxide Fume40 - 2.5185831mg/m³
Lead, Inorganic (as Pb)40mg/m³
Manganese Fume (as Mn)40 - 0.0184228mg/m³
Molybdenum (as Mo), Insoluble Compounds (Total Dust)40mg/m³
Nickel, Metal and Insoluble compounds (as Ni)40mg/m³
Vanadium fume (as V2O5)40mg/m³
Zinc Oxide Fume40 - 1.0198708mg/m³
Feb 23, 2005Planned (H) · Complete scope, Safety#300323334$01 viol.

Inspection #300323334

Dates

Opened
Feb 23, 2005
Closing Conference Date
Mar 2, 2005
Closed
May 25, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
16

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Old Hwy 75, Butner Federal Correctional Inst., Butner, NC 27509
Industry
238120 Structural Steel and Precast Concrete Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 II
Other22$0$0Apr 5, 2005--
Jul 1, 1994Unprogrammed Related (G) · Complete scope, Safety#102716511$5251 viol.

Inspection #102716511

Dates

Opened
Jul 1, 1994
Closing Conference Date
Jul 6, 1994
Closed
Jan 31, 1995

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
8
Related Activity
1 complaint

Violations and Penalties

Total Violations
1
Violation Types
1 serious
Initial Penalties
$525
Penalties on Record
$525
Site Address
Old Hwy 75, Butner Federal Correctional Inst., Butner, NC 27509
Industry
Not classified in OSHA's inspection record.

Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 F06
Serious18$525$525Dec 5, 1994--
Inspections 1 to 3 of 3, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Source: OSHA chemical exposure sampling data (OSHA Information System). P = Personal (worker breathing zone), A = Area (general air). Rows marked QC are analytical quality control measurements, not chemical exposures. OSHA PEL (Permissible Exposure Limit) values from the OSHA Occupational Chemical Database, matched via IMIS substance code (analyte code) (exact government key).

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.404Electrical - Wiring Design and Protection (Construction)2 citations · $525

Chemical exposure sampling

Samples
52
Substances
13
Inspections
1

Industry comparison

BLS 2024 survey: structural steel and precast concrete contractors reported 2.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 13.9%; NAICS 23812 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in BUTNER, NC

All employers in BUTNER →