UNIVERSAL METALCRAFTSMEN, INC
861 MARKET ST, PATERSON, NJ 07513 · NAICS 332913 Plumbing Fixture Fitting and Trim Manufacturing
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Oct 18, 2007#311049977Oct 18, 2007Complaint (B) · Partial scope, Health#311049977$00 viol.0 violations$0 in penalties
Inspection #311049977
Dates
- Opened
- Oct 18, 2007
- Closing Conference Date
- Dec 18, 2007
- Closed
- Dec 18, 2007
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 7
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 861 Market St, Paterson, NJ 07513
- Industry
- 332999 All Other Miscellaneous Fabricated Metal Product Manufacturing
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Chemical Exposure Sampling15 substances sampled
Air monitoring samples collected by OSHA during this inspection. Results grouped by substance.
| Substance | Samples | Result Range | Unit |
|---|---|---|---|
| Antimony and Compounds (as Sb) | 1 | 0 | mg/m³ |
| Beryllium and Beryllium Compounds (as Be) | 1 | 0 | mg/m³ |
| Cadmium | 1 | 0 | mg/m³ |
| Chromic Acid and Chromates (as CrO3) | 1 | 0.00013 | mg/m³ |
| Chromium, Metal and Insoluble Salts | 1 | 0 | mg/m³ |
| Chromium (VI) - TWA | 1 | 0.000067 | mg/m³ |
| Cobalt, Metal, Dust and Fume (as Co) | 1 | 0 | mg/m³ |
| Copper Fume (as Cu) | 1 | 0 | mg/m³ |
| Iron Oxide Fume | 1 | 0.0599083 | mg/m³ |
| Lead, Inorganic (as Pb) | 1 | 0 | mg/m³ |
| Manganese Fume (as Mn) | 1 | 0 | mg/m³ |
| Molybdenum (as Mo), Insoluble Compounds (Total Dust) | 1 | 0 | mg/m³ |
| Nickel, Metal and Insoluble compounds (as Ni) | 1 | 0 | mg/m³ |
| Vanadium fume (as V2O5) | 1 | 0 | mg/m³ |
| Zinc Oxide Fume | 1 | 0 | mg/m³ |
Sep 11, 2003#306555640Sep 11, 2003Planned (H) · Partial scope, Health#306555640$03 viol.3 violations$0 in penalties
Inspection #306555640
Dates
- Opened
- Sep 11, 2003
- Closing Conference Date
- Nov 7, 2003
- Closed
- Feb 11, 2004
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 10
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 3 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 861 Market St, Paterson, NJ 07513
- Industry
- 332913 Plumbing Fixture Fitting and Trim Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1910.1200 Hazard Communication OSHA citation code: 19101200 E01 | Other | 1 | 1 | $0 | $0 | Dec 16, 2003 | - | - |
| 01001B | 1910.1200 Hazard Communication OSHA citation code: 19101200 G01 | Other | 1 | 1 | $0 | $0 | Dec 16, 2003 | - | - |
| 01001C | 1910.1200 Hazard Communication OSHA citation code: 19101200 H | Other | 1 | 1 | $0 | $0 | Dec 16, 2003 | - | - |
Aug 15, 2003#306555657Aug 15, 2003Planned (H) · Partial scope, Safety#306555657$7504 viol.4 violations$750 in penalties
Inspection #306555657
Dates
- Opened
- Aug 15, 2003
- Closing Conference Date
- Oct 27, 2003
- Contested
- Dec 17, 2003
- Final Order
- May 10, 2004
- Closed
- Sep 23, 2004
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 7
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 4 serious
- Initial Penalties
- $1,500
- Penalties on Record
- $750
- Site Address
- 861 Market St, Paterson, NJ 07513
- Industry
- 332919 Other Metal Valve and Pipe Fitting Manufacturing
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.37 OSHA citation code: 19100037 A03 | Serious | 1 | 2 | $450 | $250 | Dec 8, 2003 | Dec 17, 2003 | May 10, 2004 |
| 01002A | 1910.37 OSHA citation code: 19100037 B02 | Serious | 1 | 2 | $600 | $250 | Dec 30, 2003 | Dec 17, 2003 | May 10, 2004 |
| 01002B | 1910.37 OSHA citation code: 19100037 B05 | Serious | 1 | 2 | $0 | $0 | Dec 30, 2003 | Dec 17, 2003 | May 10, 2004 |
| 01005 | 1910.304 Wiring design and protection OSHA citation code: 19100304 F04 | Serious | 1 | 2 | $450 | $250 | Dec 30, 2003 | Dec 17, 2003 | May 10, 2004 |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Source: OSHA chemical exposure sampling data (OSHA Information System). P = Personal (worker breathing zone), A = Area (general air). Rows marked QC are analytical quality control measurements, not chemical exposures. OSHA PEL (Permissible Exposure Limit) values from the OSHA Occupational Chemical Database, matched via IMIS substance code (analyte code) (exact government key).
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
3 inspections, 2003 to 2007. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Standards cited
Chemical exposure sampling
Industry comparison
Fabricated Metal Product Manufacturing, 45,899 employers with OSHA inspections. Arithmetic from DOL records.