Skip to content
SafetyRecord logoSafetyRecord
CRITICAL PATH INC
$2,400
penalties
3
viol.
1
insp.

CRITICAL PATH INC

4114 W LAKE SAMMAMISH PKWY SE AND CORNER OF 137TH AVE SE, BELLEVUE, WA 98008NAICS 238110 Poured Concrete Foundation and Structure Contractors

Inspections
1
Jul 2022 to Jul 2022 · 1 safety, 0 health
Violations
3
across 1 inspection
Penalties on record
$2,400
latest amounts in DOL records
By classification
Serious 1Willful 0Repeat 0Other 2

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Jul 5, 2022Unprogrammed Related (G) · Partial scope, Safety#346064769$2,4003 viol.

Inspection #346064769

Dates

Opened
Jul 5, 2022
Closing Conference Date
Aug 19, 2022
Final Order
Sep 9, 2022
Closed
Nov 30, 2023

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3
Related Activity
1 referral

Violations and Penalties

Total Violations
3
Violation Types
1 serious, 2 other-than-serious
Initial Penalties
$2,400
Penalties on Record
$2,400
Site Address
4114 W Lake Sammamish Pkwy Se And Corner Of 137th Ave Se, Bellevue, WA 98008
Industry
238110 Poured Concrete Foundation and Structure Contractors

Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001296-155-680(10)(A)Serious473$2,400$2,400Jul 5, 2022-Sep 9, 2022
02001296-155-110(6)Other13$0$0Sep 22, 2022-Sep 9, 2022
02002296-155-110(9)Other13$0$0Sep 22, 2022-Sep 9, 2022
Inspections 1 to 1 of 1, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

296-155-110(6)1 citation · $0
296-155-110(9)1 citation · $0
296-155-680(10)(A)1 citation · $2,400

Industry comparison

Violations per inspection
This employer3.0
Industry average2.1
Penalties per inspection
This employer$2,400
Industry average$2,530

Specialty Trade Contractors, 551,977 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: poured concrete foundation and structure contractors reported 2.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 10.7%; NAICS 23811 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in BELLEVUE, WA

All employers in BELLEVUE →