ONWEL MANUFACTURING LTD.
CHALAN KANOA BARRACKS, JACINTO AVE./JESUS ST., SAIPAN, MP 96950 · NAICS 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Aug 27, 2003#109330746Aug 27, 2003Planned (H) · Partial scope, Health#109330746$00 viol.0 violations$0 in penalties
Inspection #109330746
Dates
- Opened
- Aug 27, 2003
- Closing Conference Date
- Aug 27, 2003
- Closed
- Aug 27, 2003
Inspection
- Advance Notice
- Yes
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 419
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Barracks At Factory, Susupe, Saipan, MP 96950
- Industry
- 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Sep 16, 2002#113607899Sep 16, 2002Planned (H) · Complete scope, Health#113607899$00 viol.0 violations$0 in penalties
Inspection #113607899
Dates
- Opened
- Sep 16, 2002
- Closing Conference Date
- Sep 17, 2002
- Closed
- Sep 20, 2002
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 415
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Barracks At Factory, Susupe, Saipan, MP 96950
- Industry
- 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Sep 16, 2002#113607881Sep 16, 2002Planned (H) · Complete scope, Safety#113607881$00 viol.0 violations$0 in penalties
Inspection #113607881
Dates
- Opened
- Sep 16, 2002
- Closing Conference Date
- Sep 17, 2002
- Closed
- Sep 20, 2002
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 415
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Factory In San Antonio, Saipan, MP 96950
- Industry
- 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Mar 28, 2002#110528908Mar 28, 2002Planned (H) · Complete scope, Health#110528908$1002 viol.2 violations$100 in penalties
Inspection #110528908
Dates
- Opened
- Mar 28, 2002
- Closing Conference Date
- Mar 28, 2002
- Closed
- Aug 19, 2002
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 348
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 1 repeat, 1 other-than-serious
- Initial Penalties
- $200
- Penalties on Record
- $100
- Site Address
- Barracks In South Susupe, Saipan, MP 96950
- Industry
- 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 A02 | Repeat | 1 | 9 | $200 | $100 | Jul 1, 2002 | - | - |
| 02001 | 1910.142 Temporary Labor Camps OSHA citation code: 19100142 D02 | Other | 4 | 28 | $0 | $0 | Jul 1, 2002 | - | - |
Sep 13, 2001#110528338Sep 13, 2001Planned (H) · Complete scope, Safety#110528338$00 viol.0 violations$0 in penalties
Inspection #110528338
Dates
- Opened
- Sep 13, 2001
- Closing Conference Date
- Sep 13, 2001
- Closed
- Oct 5, 2001
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 547
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Behind Nauru Bldg., Susupe, Saipan, MP 96950
- Industry
- 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Sep 13, 2001#110527892Sep 13, 2001Planned (H) · Complete scope, Health#110527892$01 viol.1 violation$0 in penalties
Inspection #110527892
Dates
- Opened
- Sep 13, 2001
- Closing Conference Date
- Sep 13, 2001
- Closed
- Jan 29, 2002
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 449
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Barracks Inside Factory, Susupe, Saipan, MP 96950
- Industry
- 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.142 Temporary Labor Camps OSHA citation code: 19100142 F01 I | Other | 2 | 75 | $0 | $0 | Nov 16, 2001 | - | - |
Feb 15, 2001#110526266Feb 15, 2001Planned (H) · Complete scope, Health#110526266$1,3504 viol.4 violations$1,350 in penalties
Inspection #110526266
Dates
- Opened
- Feb 15, 2001
- Closing Conference Date
- Feb 16, 2001
- Closed
- Jun 11, 2001
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 534
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 1 serious, 1 repeat, 2 other-than-serious
- Initial Penalties
- $2,700
- Penalties on Record
- $1,350
- Site Address
- Chalan Kanoa Barracks, Jacinto Ave./Jesus St., Saipan, MP 96950
- Industry
- 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.142 Temporary Labor Camps OSHA citation code: 19100142 C01 | Serious | 1 | 54 | $2,500 | $1,250 | May 4, 2001 | - | - |
| 02001 | 1910.142 Temporary Labor Camps OSHA citation code: 19100142 B02 | Repeat | 4 | 18 | $200 | $100 | May 11, 2001 | - | - |
| 03001A | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 A02 | Other | 2 | 8 | $0 | $0 | May 4, 2001 | - | - |
| 03001B | 1910.304 Electrical - Wiring Design and Protection OSHA citation code: 19100304 F04 | Other | 1 | 4 | $0 | $0 | May 4, 2001 | - | - |
Mar 22, 1999#109501080Mar 22, 1999Planned (H) · Complete scope, Safety#109501080$00 viol.0 violations$0 in penalties
Inspection #109501080
Dates
- Opened
- Mar 22, 1999
- Closing Conference Date
- Mar 22, 1999
- Closed
- Mar 22, 1999
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 568
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Across From Stanford Resort, San Vicente, Saipan, MP 96950
- Industry
- 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Mar 3, 1998#109502922Mar 3, 1998Planned (H) · Complete scope, Safety#109502922$1,2764 viol.4 violations$1,276 in penalties
Inspection #109502922
Dates
- Opened
- Mar 3, 1998
- Closing Conference Date
- Mar 4, 1998
- Closed
- May 4, 1998
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 600
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 2 serious, 2 other-than-serious
- Initial Penalties
- $2,550
- Penalties on Record
- $1,276
- Site Address
- Lot 121 A & B, Texas Rd. In Susupe, Saipan, MP 96950
- Industry
- 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1910.142 Temporary Labor Camps OSHA citation code: 19100142 C01 | Serious | 1 | 125 | $1,275 | $638 | Apr 11, 1998 | - | - |
| 01002 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B01 | Serious | 1 | 40 | $1,275 | $638 | Apr 4, 1998 | - | - |
| 02001 | 1910.142 Temporary Labor Camps OSHA citation code: 19100142 B02 | Other | 2 | 12 | $0 | $0 | Apr 11, 1998 | - | - |
| 02002 | 1910.305 Electrical - Wiring Methods, Components, and Equipment OSHA citation code: 19100305 B02 | Other | 3 | 19 | $0 | $0 | Mar 29, 1998 | - | - |
Apr 6, 1992#110637006Apr 6, 1992Planned (H) · Complete scope, Safety#110637006$00 viol.0 violations$0 in penalties
Inspection #110637006
Dates
- Opened
- Apr 6, 1992
- Closing Conference Date
- Apr 6, 1992
- Closed
- Aug 7, 1992
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 230
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Lot 121 A & B, Texas Rd. In Susupe, Saipan, MP 96950
- Industry
- 721310 Rooming and Boarding Houses, Dormitories, and Workers' Camps
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
10 inspections, 1992 to 2003. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
Accommodation, 10,431 employers with OSHA inspections. Arithmetic from DOL records.
BLS 2024 survey: rooming and boarding houses, dormitories, and workers' camps reported 0.6 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 44.6%; NAICS 7213 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source