Skip to content
SafetyRecord logoSafetyRecord
OPPORTUNITY CONCRETE CORPORATION
$1,250
penalties
16
viol.
4
insp.

OPPORTUNITY CONCRETE CORPORATION

1601 SOUTH CAPITAL STREET, S.E., WASHINGTON, DC 20024

Inspections
4
Jan 1984 to Jul 1993 · 3 safety, 1 health
Violations
16
across 4 inspections
Penalties on record
$1,250
latest amounts in DOL records
By classification
Serious 7Willful 0Repeat 0Other 9

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Jul 20, 1993Planned (H) · Complete scope, Safety#123505729$1,25012 viol.

Inspection #123505729

Dates

Opened
Jul 20, 1993
Closing Conference Date
Jul 23, 1993
Closed
Dec 20, 1993

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
55

Violations and Penalties

Total Violations
12
Violation Types
7 serious, 5 other-than-serious
Initial Penalties
$2,475
Penalties on Record
$1,250
Site Address
1601 South Capital Street, S.e., Washington, DC 20024
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (12 of 12 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
01001A1910.38
Emergency Action Plans
OSHA citation code: 19100038 A01
Serious110$375$200Sep 7, 1993--
01001B1910.38
Emergency Action Plans
OSHA citation code: 19100038 B02
Serious110$0$0Sep 7, 1993--
01001C1910.38
Emergency Action Plans
OSHA citation code: 19100038 B03
Serious110$0$0Aug 12, 1993--
010021910.146
Permit-Required Confined Spaces
OSHA citation code: 19100146 C04
Serious12$625$200Sep 7, 1993--
010031910.147
Control of Hazardous Energy (Lockout/Tagout)
OSHA citation code: 19100147 C04 II
Serious16$375$200Sep 7, 1993--
010041910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 C02 I
Serious12$375$200Aug 24, 1993--
010051910.219
Mechanical Power-Transmission Apparatus
OSHA citation code: 19100219 E01 I
Serious12$375$200Aug 17, 1993--
020011910.22
Walking-Working Surfaces - General Requirements
OSHA citation code: 19100022 A01
Other110$0$0Aug 11, 1993--
020021910.95
Occupational Noise Exposure
OSHA citation code: 19100095 C01
Other13$350$250Nov 1, 1993--
020031910.133
Eye and Face Protection
OSHA citation code: 19100133 A01
Other11$0$0Aug 10, 1993--
020041910.242
Hand and Portable Powered Tools and Equipment, General
OSHA citation code: 19100242 A
Other15$0$0Aug 10, 1993--
020051910.243
Guarding of Portable Powered Tools
OSHA citation code: 19100243 B01
Other13$0$0Aug 17, 1993--
Jan 29, 1988Planned (H) · No Inspection scope, Health#631812$00 viol.

Inspection #631812

Dates

Opened
Jan 29, 1988
Closing Conference Date
Jan 29, 1988
Closed
Feb 2, 1988

Inspection

Advance Notice
No
Owner Type
Private
Union Status
Not recorded
Number of Employees
Not recorded

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
#1 Potomac Avenue Se, Washington, DC 20003
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Jun 17, 1986Planned (H) · Partial scope, Safety#100425248$04 viol.

Inspection #100425248

Dates

Opened
Jun 17, 1986
Closing Conference Date
Jun 18, 1986
Closed
Oct 1, 1986

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
60

Violations and Penalties

Total Violations
4
Violation Types
4 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1 Potomac Avenue Se, Washington, DC 20003
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 A02
Other12$0$0Jul 8, 1986--
010021910.215
Abrasive Wheel Machinery
OSHA citation code: 19100215 A04
Other12$0$0Jul 8, 1986--
010031910.1200
Hazard Communication
OSHA citation code: 19101200 E01
Other110$0$0Aug 13, 1986--
010041910.1200
Hazard Communication
OSHA citation code: 19101200 H
Other110$0$0Aug 13, 1986--
Jan 31, 1984Planned (H) · Records Only scope, Safety#172692$00 viol.

Inspection #172692

Dates

Opened
Jan 31, 1984
Closing Conference Date
Jan 31, 1984
Closed
Feb 13, 1984

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
40

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
1 Potomac Ave Se, Washington, DC 20003
Industry
Not classified in OSHA's inspection record.

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 4 of 4, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.38Emergency Action Plans3 citations · $200
1910.219Mechanical Power-Transmission Apparatus2 citations · $400
1910.215Abrasive Wheel Machinery2 citations · $0

Other inspected employers in WASHINGTON, DC

All employers in WASHINGTON →