Skip to content
SafetyRecord logoSafetyRecord
GENERAL CONCRETE CO INC
$1,035
penalties
16
viol.
3
insp.

GENERAL CONCRETE CO INC

6TH & ARCH ST, Philadelphia, PA 19106NAICS 238110 Poured Concrete Foundation and Structure Contractors

Inspections
3
Feb 1974 to Jul 1974 · 3 safety, 0 health
Violations
16
across 3 inspections
Penalties on record
$1,035
latest amounts in DOL records
By classification
Serious 1Willful 0Repeat 0Other 15

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Jul 8, 1974Planned (H) · Complete scope, Safety#12761227$95011 viol.

Inspection #12761227

Dates

Opened
Jul 8, 1974
Closing Conference Date
Jul 8, 1974
Contested
Jul 15, 1974
Closed
Mar 10, 1984

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Not displayed
Number of Employees
65

Violations and Penalties

Total Violations
11
Violation Types
1 serious, 10 other-than-serious
Initial Penalties
$950
Penalties on Record
$950
Site Address
6th & Arch St, Philadelphia, PA 19106
Industry
238110 Poured Concrete Foundation and Structure Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (11 of 11 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.304
Woodworking Tools
OSHA citation code: 19260304 F
Other3-$45$45Jul 25, 1974Jul 15, 1974-
010021910.252
Welding, Cutting, and Brazing - General Requirements
OSHA citation code: 19100252 A02 IVC0
Other2-$0$0Jul 25, 1974Jul 15, 1974-
010031926.25
Housekeeping
OSHA citation code: 19260025 A
Other4-$0$0Jul 25, 1974Jul 15, 1974-
010041926.152
Flammable Liquids
OSHA citation code: 19260152 A01
Other2-$55$55Jul 25, 1974Jul 15, 1974-
010051926.350
Gas Welding and Cutting
OSHA citation code: 19260350 A01
Other5-$0$0Jul 25, 1974Jul 15, 1974-
010061926.350
Gas Welding and Cutting
OSHA citation code: 19260350 A09
Other3-$0$0Jul 25, 1974Jul 15, 1974-
010071926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 B01
Other12-$55$55Jul 25, 1974Jul 15, 1974-
010081926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 D01
Other2-$45$45Jul 25, 1974Jul 15, 1974-
010091926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 E01
Other1-$0$0Jul 25, 1974Jul 15, 1974-
010101926.401
OSHA citation code: 19260401 A01
Other2-$0$0Jul 25, 1974Jul 15, 1974-
020011926.28
Personal Protective Equipment
OSHA citation code: 19260028 A
Serious3-$750$750Jul 25, 1974Jul 15, 1974-
Apr 8, 1974Planned (H) · Complete scope, Safety#12666921$353 viol.

Inspection #12666921

Dates

Opened
Apr 8, 1974
Closing Conference Date
Apr 8, 1974
Closed
Mar 10, 1984

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Not displayed
Number of Employees
40

Violations and Penalties

Total Violations
3
Violation Types
3 other-than-serious
Initial Penalties
$35
Penalties on Record
$35
Site Address
6th And Arch St, Philadelphia, PA 19106
Industry
238110 Poured Concrete Foundation and Structure Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
0100119260L51
OSHA citation code: 19260L51 T
Other1-$0$0Apr 11, 1974--
010021926.150
Fire Protection (Construction)
OSHA citation code: 19260150 C01 I
Other2-$35$35Apr 26, 1974--
010031926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 B01
Other1-$0$0Apr 11, 1974--
Feb 7, 1974Planned (H) · Complete scope, Safety#12674172$502 viol.

Inspection #12674172

Dates

Opened
Feb 7, 1974
Closing Conference Date
Feb 7, 1974
Closed
Mar 10, 1984

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
Not displayed
Number of Employees
200

Violations and Penalties

Total Violations
2
Violation Types
2 other-than-serious
Initial Penalties
$50
Penalties on Record
$50
Site Address
6th And Arch Street, Philadelphia, PA 19106
Industry
238110 Poured Concrete Foundation and Structure Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 A04
Other1-$0$0Feb 12, 1974--
010021926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 D02
Other1-$50$50Feb 12, 1974--
Inspections 1 to 3 of 3, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.500Fall Protection - Scope, Application, and Definitions5 citations · $150
1926.350Gas Welding and Cutting2 citations · $0
1926.28Personal Protective Equipment1 citation · $750

Industry comparison

Violations per inspection
This employer5.3
Industry average2.1
Penalties per inspection
This employer$345
Industry average$2,542

Specialty Trade Contractors, 558,619 employers with OSHA inspections. Arithmetic from DOL records.

Other inspected employers in Philadelphia, PA

All employers in Philadelphia →