CONRAD CONSTRUCTION CO
JOHNSON SQUARE OFFICE BLDG, Savannah, GA 31404 · NAICS 238110 Poured Concrete Foundation and Structure Contractors
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Feb 9, 2005#122234495Feb 9, 2005Planned (H) · Complete scope, Safety#122234495$3,6002 viol.2 violations$3,600 in penalties
Inspection #122234495
Dates
- Opened
- Feb 9, 2005
- Closing Conference Date
- Feb 9, 2005
- Closed
- Mar 17, 2005
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 16
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 serious
- Initial Penalties
- $6,000
- Penalties on Record
- $3,600
- Site Address
- 301 East Bay Street, Savannah, GA 31401
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.550 Cranes and Derricks OSHA citation code: 19260550 A15 I | Serious | 1 | 3 | $3,000 | $1,800 | Feb 24, 2005 | - | - |
| 01002 | 1926.550 Cranes and Derricks OSHA citation code: 19260550 A15 IV | Serious | 1 | 3 | $3,000 | $1,800 | Feb 24, 2005 | - | - |
Dec 2, 2004#122234701Dec 2, 2004Planned (H) · Complete scope, Safety#122234701$1,8751 viol.1 violation$1,875 in penalties
Inspection #122234701
Dates
- Opened
- Dec 2, 2004
- Closing Conference Date
- Dec 2, 2004
- Closed
- Jan 7, 2005
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 20
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 serious
- Initial Penalties
- $2,500
- Penalties on Record
- $1,875
- Site Address
- 321 West Bay Street, Savannah, GA 31401
- Industry
- 238990 All Other Specialty Trade Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B01 | Serious | 1 | 2 | $2,500 | $1,875 | Dec 16, 2004 | - | - |
Apr 18, 1990#17402728Apr 18, 1990Planned (H) · Complete scope, Safety#17402728$7402 viol.2 violations$740 in penalties
Inspection #17402728
Dates
- Opened
- Apr 18, 1990
- Closing Conference Date
- Apr 18, 1990
- Closed
- Jun 6, 1990
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 3
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 1 serious, 1 repeat
- Initial Penalties
- $1,440
- Penalties on Record
- $740
- Site Address
- 7804 Abercorn Street - Belk Department Store, Savannah, GA 31406
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.500 Fall Protection - Scope, Application, and Definitions OSHA citation code: 19260500 D01 | Serious | 1 | 1 | $480 | $240 | May 24, 1990 | - | - |
| 02001 | 1926.701 Concrete and Masonry Construction - General Requirements OSHA citation code: 19260701 B | Repeat | 12 | 1 | $960 | $500 | May 24, 1990 | - | - |
Nov 14, 1989#107057218Nov 14, 1989Unprogrammed Related (G) · Complete scope, Safety#107057218$7843 viol.3 violations$784 in penalties
Inspection #107057218
Dates
- Opened
- Nov 14, 1989
- Closing Conference Date
- Nov 16, 1989
- Closed
- Jan 16, 1990
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 8
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 3 serious
- Initial Penalties
- $1,120
- Penalties on Record
- $784
- Site Address
- 14045 Abercorn Extn. (savannah Mall), Savannah, GA 31419
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.550 Cranes and Derricks OSHA citation code: 19260550 A09 | Serious | 1 | 8 | $420 | $294 | Dec 21, 1989 | - | - |
| 01002 | 1926.602 Material Handling Equipment OSHA citation code: 19260602 C01 VI | Serious | 1 | 8 | $350 | $245 | Dec 21, 1989 | - | - |
| 01003 | 1926.701 Concrete and Masonry Construction - General Requirements OSHA citation code: 19260701 B | Serious | 100 | 8 | $350 | $245 | Dec 20, 1989 | - | - |
Dec 14, 1982#13088778Dec 14, 1982Planned (H) · Complete scope, Safety#13088778$4903 viol.3 violations$490 in penalties
Inspection #13088778
Dates
- Opened
- Dec 14, 1982
- Closing Conference Date
- Dec 16, 1982
- Closed
- Mar 8, 1983
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 20
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 3 serious
- Initial Penalties
- $1,470
- Penalties on Record
- $490
- Site Address
- Johnson Square Bldg, Savannah, GA 31401
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.500 Fall Protection - Scope, Application, and Definitions OSHA citation code: 19260500 D01 | Serious | 7 | - | $490 | $245 | Jan 30, 1983 | - | - |
| 01002 | 1926.500 Fall Protection - Scope, Application, and Definitions OSHA citation code: 19260500 F01 IV | Serious | 1 | - | $490 | $245 | Jan 30, 1983 | - | - |
| 01003 | 1926.500 Fall Protection - Scope, Application, and Definitions OSHA citation code: 19260500 F01 VIA | Serious | 1 | - | $490 | $0 | Jan 30, 1983 | - | - |
Sep 14, 1982#13105465Sep 14, 1982Planned (H) · Complete scope, Safety#13105465$48014 viol.14 violations$480 in penalties
Inspection #13105465
Dates
- Opened
- Sep 14, 1982
- Closing Conference Date
- Sep 14, 1982
- Closed
- Oct 21, 1982
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 11
Violations and Penalties
- Total Violations
- 14
- Violation Types
- 6 serious, 8 other-than-serious
- Initial Penalties
- $480
- Penalties on Record
- $480
- Site Address
- Johnson Square Office Bldg, Savannah, GA 31401
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 14 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.302 Power-Operated Hand Tools OSHA citation code: 19260302 A01 | Serious | 1 | - | $320 | $320 | Sep 14, 1982 | - | - |
| 01001B | 1926.401 OSHA citation code: 19260401 H | Serious | 1 | - | $0 | $0 | Sep 14, 1982 | - | - |
| 01001C | 1926.400 Introduction (Electrical - Construction) OSHA citation code: 19260400 H01 | Serious | 1 | - | $0 | $0 | Sep 14, 1982 | - | - |
| 01001D | 1926.400 Introduction (Electrical - Construction) OSHA citation code: 19260400 A 011017 | Serious | 1 | - | $0 | $0 | Sep 14, 1982 | - | - |
| 01002A | 1926.350 Gas Welding and Cutting OSHA citation code: 19260350 B03 | Serious | 2 | - | $160 | $160 | Sep 14, 1982 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 14 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Aug 11, 1982#13088349Aug 11, 1982Planned (H) · Complete scope, Safety#13088349$00 viol.0 violations$0 in penalties
Inspection #13088349
Dates
- Opened
- Aug 11, 1982
- Closing Conference Date
- Aug 12, 1982
- Closed
- Aug 25, 1982
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 5
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 5002 Waters Ave, Savannah, GA 31404
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Sep 11, 1980#14269674Sep 11, 1980Unprogrammed Related (G) · Complete scope, Safety#14269674$00 viol.0 violations$0 in penalties
Inspection #14269674
Dates
- Opened
- Sep 11, 1980
- Closing Conference Date
- Sep 12, 1980
- Closed
- Oct 6, 1980
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 14
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 2 W Bay St, Savannah, GA 31401
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
May 14, 1980#14269492May 14, 1980Planned (H) · Complete scope, Safety#14269492$01 viol.1 violation$0 in penalties
Inspection #14269492
Dates
- Opened
- May 14, 1980
- Closing Conference Date
- May 15, 1980
- Closed
- Jun 11, 1980
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 55
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 2 W Bay St, Savannah, GA 31401
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.401 OSHA citation code: 19260401 C | Other | 1 | - | $0 | $0 | May 14, 1980 | - | - |
Oct 20, 1979#14269112Oct 20, 1979Planned (H) · Complete scope, Safety#14269112$00 viol.0 violations$0 in penalties
Inspection #14269112
Dates
- Opened
- Oct 20, 1979
- Closing Conference Date
- Oct 31, 1979
- Closed
- Mar 10, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- No
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 2 W Bay St, Savannah, GA 31404
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
10 inspections, 1979 to 2005. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
Specialty Trade Contractors, 558,619 employers with OSHA inspections. Arithmetic from DOL records.