CORMAN CONSTRUCTION INC
FRANKLIN ST BRIDGE FRANKLIN ST NE, WASHINGTON, DC 20017
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
May 5, 2014#339755092May 5, 2014Planned (H) · Partial scope, Safety#339755092$00 viol.0 violations$0 in penalties
Inspection #339755092
Dates
- Opened
- May 5, 2014
- Closing Conference Date
- May 5, 2014
- Closed
- May 5, 2014
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 300
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 680 Rhode Island Ave. Ne, Washington, DC 20002
- Industry
- 237310 Highway, Street, and Bridge Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Jan 7, 2008#311715544Jan 7, 2008Referral (C) · Complete scope, Safety#311715544$00 viol.0 violations$0 in penalties
Inspection #311715544
Dates
- Opened
- Jan 7, 2008
- Closing Conference Date
- Jan 7, 2008
- Closed
- Jan 22, 2008
Inspection
- Advance Notice
- Yes
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 13
- Related Activity
- 1 referral
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Frederick Douglas Bridge, S.e., Washington, DC 20020
- Industry
- 237310 Highway, Street, and Bridge Construction
Referral Inspection: This inspection record is categorized as a referral inspection in the DOL OSHA enforcement data. Referral inspections can result from another agency, another OSHA activity, or another source referring a potential hazard to OSHA.
Aug 17, 2007#311276968Aug 17, 2007Referral (C) · Complete scope, Safety#311276968$00 viol.0 violations$0 in penalties
Inspection #311276968
Dates
- Opened
- Aug 17, 2007
- Closing Conference Date
- Aug 20, 2007
- Closed
- Aug 28, 2007
Inspection
- Advance Notice
- Yes
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 90
- Related Activity
- 1 referral
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Frederick Douglas Bridge, S.e., Washington, DC 20020
- Industry
- 237310 Highway, Street, and Bridge Construction
Referral Inspection: This inspection record is categorized as a referral inspection in the DOL OSHA enforcement data. Referral inspections can result from another agency, another OSHA activity, or another source referring a potential hazard to OSHA.
Sep 8, 2003#306693227Sep 8, 2003Planned (H) · Partial scope, Safety#306693227$00 viol.0 violations$0 in penalties
Inspection #306693227
Dates
- Opened
- Sep 8, 2003
- Closing Conference Date
- Sep 9, 2003
- Closed
- Sep 23, 2003
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 20
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1900 Mass Ave Se, Washington, DC 20003
- Industry
- 237110 Water and Sewer Line and Related Structures Construction
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Feb 12, 2002#304757354Feb 12, 2002Planned (H) · Complete scope, Safety#304757354$2,4505 viol.5 violations$2,450 in penalties
Inspection #304757354
Dates
- Opened
- Feb 12, 2002
- Closing Conference Date
- Feb 12, 2002
- Closed
- Apr 2, 2002
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 5
- Violation Types
- 3 other-than-serious, 2 unclassified
- Initial Penalties
- $2,975
- Penalties on Record
- $2,450
- Site Address
- Benning Road Bridge Project, Washington, DC 20019
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 5 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.106 Working Over or Near Water OSHA citation code: 19260106 C | Unclassified | 1 | 1 | $875 | $875 | Mar 6, 2002 | - | - |
| 01002A | 1926.150 Fire Protection (Construction) OSHA citation code: 19260150 C01 VI | Other | 1 | 2 | $525 | $0 | Mar 6, 2002 | - | - |
| 01002B | 1926.350 Gas Welding and Cutting OSHA citation code: 19260350 A10 | Other | 1 | 2 | $0 | $0 | Mar 6, 2002 | - | - |
| 01003 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B01 | Unclassified | 1 | 1 | $700 | $700 | Mar 6, 2002 | - | - |
| 01005 | 1926.250 General Requirements for Storage OSHA citation code: 19260250 A04 | Other | 1 | 1 | $875 | $875 | Mar 6, 2002 | - | - |
Oct 17, 2001#303857148Oct 17, 2001Planned (H) · Complete scope, Safety#303857148$00 viol.0 violations$0 in penalties
Inspection #303857148
Dates
- Opened
- Oct 17, 2001
- Closing Conference Date
- Oct 17, 2001
- Closed
- Oct 22, 2001
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 12
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 5900 Macarthur Blvd, N.w., Washington, DC 20315
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Oct 11, 2000#303852651Oct 11, 2000Planned (H) · Partial scope, Safety#303852651$00 viol.0 violations$0 in penalties
Inspection #303852651
Dates
- Opened
- Oct 11, 2000
- Closing Conference Date
- Oct 11, 2000
- Closed
- Oct 20, 2000
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 15
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 800 Frontage Road Sw, Washington, DC 20024
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Jul 21, 1992#123502882Jul 21, 1992Programmed Related (I) · Complete scope, Safety#123502882$01 viol.1 violation$0 in penalties
Inspection #123502882
Dates
- Opened
- Jul 21, 1992
- Closing Conference Date
- Aug 4, 1992
- Closed
- Aug 24, 1992
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 5
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 3800 Reservoir Road, N.w., Washington, DC 20007
- Industry
- Not classified in OSHA's inspection record.
Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 F07 IV | Other | 1 | 2 | $0 | $0 | Aug 20, 1992 | - | - |
Jun 25, 1986#100426246Jun 25, 1986Planned (H) · Complete scope, Safety#100426246$02 viol.2 violations$0 in penalties
Inspection #100426246
Dates
- Opened
- Jun 25, 1986
- Closing Conference Date
- Jun 27, 1986
- Contested
- Jul 29, 1986
- Closed
- May 26, 1987
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 7
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 1 serious, 1 other-than-serious
- Initial Penalties
- $420
- Penalties on Record
- $0
- Site Address
- Yuma Place And Yuma Street Nw, Washington, DC 20016
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Enforcement Outcome
Citation contest activity appears on Jul 29, 1986. Final orders are recorded through May 12, 1987. Penalty changes shown on this page reflect the latest amounts published in OSHA's enforcement data.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.652 Excavations - Protection of Employees OSHA citation code: 19260652 B | Serious | 1 | 1 | $420 | $0 | Jul 11, 1986 | Jul 29, 1986 | May 12, 1987 |
| 02001 | 1926.28 Personal Protective Equipment OSHA citation code: 19260028 A | Other | 1 | 1 | $0 | $0 | Jul 11, 1986 | - | - |
Sep 5, 1984#1843887Sep 5, 1984Planned (H) · Complete scope, Safety#1843887$45012 viol.12 violations$450 in penalties
Inspection #1843887
Dates
- Opened
- Sep 5, 1984
- Closing Conference Date
- Sep 5, 1984
- Closed
- Nov 14, 1984
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 21
Violations and Penalties
- Total Violations
- 12
- Violation Types
- 3 serious, 9 other-than-serious
- Initial Penalties
- $1,800
- Penalties on Record
- $450
- Site Address
- Franklin St Bridge Franklin St Ne, Washington, DC 20017
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 12 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.28 Personal Protective Equipment OSHA citation code: 19260028 A | Serious | 1 | 1 | $450 | $0 | Oct 12, 1984 | - | - |
| 01002 | 1926.500 Fall Protection - Scope, Application, and Definitions OSHA citation code: 19260500 D01 | Serious | 1 | 2 | $450 | $200 | Oct 12, 1984 | - | - |
| 01003 | 1926.651 Excavations - Specific Excavation Requirements OSHA citation code: 19260651 C | Other | 1 | 2 | $360 | $0 | Oct 12, 1984 | - | - |
| 01004 | 1926.700 Concrete and Masonry Construction - Scope, Application, and Definitions OSHA citation code: 19260700 B02 | Serious | 1 | 2 | $540 | $250 | Oct 12, 1984 | - | - |
| 02001 | 1926.401 OSHA citation code: 19260401 A01 | Other | 1 | 2 | $0 | $0 | Oct 12, 1984 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 12 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
12 inspections, 1983 to 2014. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.