Inspection records
Sep 16, 1987#102572492Sep 16, 1987Unprogrammed Related (G) · Partial scope, Safety#102572492$00 viol.0 violations$0 in penalties
Inspection #102572492
Dates
- Opened
- Sep 16, 1987
- Closing Conference Date
- Oct 15, 1987
- Closed
- Feb 5, 1988
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 200
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 4450 North German Church Road, Byron, IL 61010
- Industry
- Not classified in OSHA's inspection record.
Unprogrammed Related Inspection: This inspection record is categorized as an unprogrammed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Dec 5, 1985#100080779Dec 5, 1985Complaint (B) · Partial scope, Safety#100080779$00 viol.0 violations$0 in penalties
Inspection #100080779
Dates
- Opened
- Dec 5, 1985
- Closing Conference Date
- Jan 23, 1986
- Closed
- Jan 28, 1986
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Yes
- Number of Employees
- 900
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Byron Nuclear Station, Byron, IL 61010
- Industry
- Not classified in OSHA's inspection record.
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Feb 29, 1984#250076Feb 29, 1984Planned (H) · Complete scope, Safety#250076$5404 viol.4 violations$540 in penalties
Inspection #250076
Dates
- Opened
- Feb 29, 1984
- Closing Conference Date
- Apr 19, 1984
- Closed
- Jun 27, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 1,147
Violations and Penalties
- Total Violations
- 4
- Violation Types
- 1 serious, 1 repeat, 2 other-than-serious
- Initial Penalties
- $1,440
- Penalties on Record
- $540
- Site Address
- Byron Nuclear Station, Byron, IL 61010
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (4 of 4 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.28 Personal Protective Equipment OSHA citation code: 19260028 A | Serious | 1 | 1 | $360 | $360 | May 28, 1984 | - | - |
| 02001 | 1926.21 Safety Training and Education OSHA citation code: 19260021 B06 I | Repeat | 2 | 11 | $1,080 | $180 | Jun 18, 1984 | - | - |
| 03001 | 1926.303 Abrasive Wheels and Tools OSHA citation code: 19260303 B | Other | 1 | 4 | $0 | $0 | May 28, 1984 | - | - |
| 03002 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 A13 | Other | 1 | 2 | $0 | $0 | May 28, 1984 | - | - |
Feb 29, 1984#248799Feb 29, 1984Planned (H) · Complete scope, Health#248799$05 viol.5 violations$0 in penalties
Inspection #248799
Dates
- Opened
- Feb 29, 1984
- Closing Conference Date
- Aug 22, 1984
- Closed
- Jan 14, 1985
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 1,147
Violations and Penalties
- Total Violations
- 5
- Violation Types
- 5 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Byron Nuclear Station, Byron, IL 61010
- Industry
- Not classified in OSHA's inspection record.
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Chemical Exposure Sampling13 substances sampled
Air monitoring samples collected by OSHA during this inspection. Results grouped by substance.
| Substance | Samples | Result Range | Unit |
|---|---|---|---|
| Antimony and Compounds (as Sb) | 4 | 0 | mg/m³ |
| Beryllium and Beryllium Compounds (as Be) | 4 | 0 | mg/m³ |
| Cadmium Fume (as Cd) | 4 | 0 | mg/m³ |
| Chromium, Soluble Chromic, Chromous Salts (as Cr) | 4 | 0 - 1.3676 | mg/m³ |
| Cobalt, Metal, Dust and Fume (as Co) | 4 | 0.0042 - 0.0563 | mg/m³ |
| Copper Fume (as Cu) | 4 | 0.0018 - 0.0824 | mg/m³ |
| Iron Oxide Fume | 4 | 0.6196 - 7.674 | mg/m³ |
| Lead, Inorganic (as Pb) | 4 | 0 | mg/m³ |
| Manganese Fume (as Mn) | 4 | 0.0409 - 0.7512 | mg/m³ |
| Molybdenum (as Mo), Soluble Compounds | 4 | 0 - 0.0261 | mg/m³ |
| Nickel, Metal and Insoluble compounds (as Ni) | 4 | 0 - 0.9693 | mg/m³ |
| Vanadium fume (as V2O5) | 4 | 0 - 0.0055 | mg/m³ |
| Zinc Oxide Fume | 4 | 0.0059 - 0.0087 | mg/m³ |
Violations
Violation list (5 of 5 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1910.20 Access to Employee Exposure and Medical Records OSHA citation code: 19100020 G01 I | Other | 1 | 1,147 | $0 | $0 | Nov 3, 1984 | - | - |
| 01001B | 1910.20 Access to Employee Exposure and Medical Records OSHA citation code: 19100020 G01 II | Other | 1 | 1,147 | $0 | $0 | Nov 3, 1984 | - | - |
| 01001C | 1910.20 Access to Employee Exposure and Medical Records OSHA citation code: 19100020 G01 III | Other | 1 | 1,147 | $0 | $0 | Nov 3, 1984 | - | - |
| 01001D | 1910.20 Access to Employee Exposure and Medical Records OSHA citation code: 19100020 G02 | Other | 1 | 1,147 | $0 | $0 | Nov 3, 1984 | - | - |
| 01002 | 1926.52 Occupational Noise Exposure (Construction) OSHA citation code: 19260052 B | Other | 1 | 1 | $0 | $0 | Oct 26, 1984 | - | - |
Aug 18, 1983#14437917Aug 18, 1983Complaint (B) · Partial scope, Health#14437917$00 viol.0 violations$0 in penalties
Inspection #14437917
Dates
- Opened
- Aug 18, 1983
- Closing Conference Date
- Sep 13, 1983
- Closed
- Sep 19, 1983
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 1,181
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Com Ed Nuclear Power Station, Byron, IL 61010
- Industry
- Not classified in OSHA's inspection record.
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Jul 7, 1981#14456172Jul 7, 1981Accident (A) · Partial scope, Safety#14456172$4007 viol.7 violations$400 in penalties
Inspection #14456172
Dates
- Opened
- Jul 7, 1981
- Closing Conference Date
- Jul 29, 1981
- Contested
- Aug 15, 1981
- Closed
- May 27, 1982
Inspection
- Advance Notice
- Yes
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 1,020
- Related Activity
- 1 accident
Violations and Penalties
- Total Violations
- 7
- Violation Types
- 2 serious, 4 willful, 1 other-than-serious
- Initial Penalties
- $9,000
- Penalties on Record
- $400
- Site Address
- Com - Ed Nuclear Power Station, Byron, IL 61010
- Industry
- Not classified in OSHA's inspection record.
Accident Inspection: This inspection record is categorized as an accident inspection in the U.S. Department of Labor OSHA enforcement data. Employers must report work-related fatalities within 8 hours, and work-related inpatient hospitalizations, amputations, or losses of an eye within 24 hours. An accident-related inspection does not by itself determine fault.
Violations
Violation list (5 of 7 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.21 Safety Training and Education OSHA citation code: 19260021 B06 I | Serious | 1 | - | $9,000 | $400 | Aug 7, 1981 | Aug 15, 1981 | - |
| 01001B | 1926.103 Respiratory Protection (Construction) OSHA citation code: 19260103 A01 | Serious | 1 | - | $0 | $0 | Aug 13, 1981 | Aug 15, 1981 | - |
| 01001C | 1926.55 Gases, Vapors, Fumes, Dusts, and Mists OSHA citation code: 19260055 A | Willful | 1 | - | $0 | $0 | Aug 7, 1981 | Aug 15, 1981 | - |
| 01001D | 1926.55 Gases, Vapors, Fumes, Dusts, and Mists OSHA citation code: 19260055 B | Willful | 1 | - | $0 | $0 | Aug 7, 1981 | Aug 15, 1981 | - |
| 01001E | 1926.57 Ventilation OSHA citation code: 19260057 C | Willful | 1 | - | $0 | $0 | Aug 13, 1981 | Aug 15, 1981 | - |
Showing the 5 violations listed first by citation identifier. This inspection has 7 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
May 31, 1979#14476386May 31, 1979Accident (A) · Partial scope, Safety#14476386$3,1002 viol.2 violations$3,100 in penalties
Inspection #14476386
Dates
- Opened
- May 31, 1979
- Closing Conference Date
- Jun 4, 1979
- Contested
- Jun 15, 1979
- Closed
- Jun 11, 1980
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 700
- Related Activity
- 1 accident
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 willful
- Initial Penalties
- $9,100
- Penalties on Record
- $3,100
- Site Address
- Com-Ed Nuclear Power Station, Byron, IL 61010
- Industry
- Not classified in OSHA's inspection record.
Accident Inspection: This inspection record is categorized as an accident inspection in the U.S. Department of Labor OSHA enforcement data. Employers must report work-related fatalities within 8 hours, and work-related inpatient hospitalizations, amputations, or losses of an eye within 24 hours. An accident-related inspection does not by itself determine fault.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.21 Safety Training and Education OSHA citation code: 19260021 B06 I | Willful | 9 | - | $6,300 | $2,700 | Jul 5, 1979 | Jun 15, 1979 | - |
| 01002 | 1926.450 Scaffolding - Scope, Application, and Definitions OSHA citation code: 19260450 A06 | Willful | 1 | - | $2,800 | $400 | Jun 5, 1979 | Jun 15, 1979 | - |
May 17, 1979#14448724May 17, 1979Complaint (B) · Complete scope, Safety#14448724$4902 viol.2 violations$490 in penalties
Inspection #14448724
Dates
- Opened
- May 17, 1979
- Closing Conference Date
- May 19, 1979
- Closed
- Jun 27, 1979
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 700
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 1 serious, 1 other-than-serious
- Initial Penalties
- $490
- Penalties on Record
- $490
- Site Address
- Byron Nuclear Power Station, Byron, IL 61010
- Industry
- Not classified in OSHA's inspection record.
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.303 Abrasive Wheels and Tools OSHA citation code: 19260303 C03 | Serious | 1 | - | $490 | $490 | Jun 17, 1979 | - | - |
| 02001 | 1926.250 General Requirements for Storage OSHA citation code: 19260250 A03 | Other | 1 | - | $0 | $0 | Jun 17, 1979 | - | - |
Sep 12, 1978#14470231Sep 12, 1978Complaint (B) · Partial scope, Health#14470231$00 viol.0 violations$0 in penalties
Inspection #14470231
Dates
- Opened
- Sep 12, 1978
- Closing Conference Date
- Oct 18, 1978
- Closed
- Mar 10, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 550
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Byron Generating Station, Byron, IL 61010
- Industry
- Not classified in OSHA's inspection record.
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
May 23, 1978#14479414May 23, 1978Complaint (B) · Complete scope, Safety#14479414$00 viol.0 violations$0 in penalties
Inspection #14479414
Dates
- Opened
- May 23, 1978
- Closing Conference Date
- May 26, 1978
- Closed
- Mar 10, 1984
Inspection
- Advance Notice
- Not recorded
- Owner Type
- Not recorded
- Union Status
- Yes
- Number of Employees
- 533
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 5 Miles S 72 Bryon-German Chur, Byron, IL 61108
- Industry
- Not classified in OSHA's inspection record.
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Source: OSHA chemical exposure sampling data (OSHA Information System). P = Personal (worker breathing zone), A = Area (general air). Rows marked QC are analytical quality control measurements, not chemical exposures. OSHA PEL (Permissible Exposure Limit) values from the OSHA Occupational Chemical Database, matched via IMIS substance code (analyte code) (exact government key).
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
11 inspections, 1977 to 1987. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.