KEVIN BARBOUR PLASTERING & STUCCO CO.
14309 OUTLOOK, OVERLAND PARK, KS 66202 · NAICS 238140 Masonry Contractors
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jun 6, 2012#316037597Jun 6, 2012Follow-Up (F) · No Inspection scope, Safety#316037597$00 viol.0 violations$0 in penalties
Inspection #316037597
Dates
- Opened
- Jun 6, 2012
- Closing Conference Date
- Jun 6, 2012
- Closed
- Jun 6, 2012
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Not recorded
- Number of Employees
- Not recorded
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 12533 W. 119th Terr, Overland Park, KS 66213
- Industry
- 238140 Masonry Contractors
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Jan 18, 2012#316036177Jan 18, 2012Follow-Up (F) · No Inspection scope, Safety#316036177$00 viol.0 violations$0 in penalties
Inspection #316036177
Dates
- Opened
- Jan 18, 2012
- Closing Conference Date
- Jan 18, 2012
- Closed
- Jan 18, 2012
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Not recorded
- Number of Employees
- Not recorded
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 12533 W. 119th Terr, Overland Park, KS 66213
- Industry
- 238310 Drywall and Insulation Contractors
Follow-Up Inspection: This inspection record is categorized as a follow-up inspection in the DOL OSHA enforcement data. Follow-up inspections are used by OSHA after earlier enforcement activity and can be used to check later compliance status.
Jun 16, 2010#314027582Jun 16, 2010Referral (C) · Partial scope, Safety#314027582$4,7009 viol.9 violations$4,700 in penalties
Inspection #314027582
Dates
- Opened
- Jun 16, 2010
- Closing Conference Date
- Jun 16, 2010
- Contested
- Sep 13, 2010
- Final Order
- Jun 1, 2011
- Closed
- Aug 26, 2015
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 4
- Related Activity
- 1 referral
Violations and Penalties
- Total Violations
- 9
- Violation Types
- 9 serious
- Initial Penalties
- $13,250
- Penalties on Record
- $4,700
- Site Address
- 12533 W. 119th Terr, Overland Park, KS 66213
- Industry
- 238310 Drywall and Insulation Contractors
Referral Inspection: This inspection record is categorized as a referral inspection in the DOL OSHA enforcement data. Referral inspections can result from another agency, another OSHA activity, or another source referring a potential hazard to OSHA.
Violations
Violation list (8 of 9 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1910.1200 Hazard Communication OSHA citation code: 19101200 E01 | Serious | 1 | 3 | $1,000 | $405 | Mar 11, 2011 | Sep 13, 2010 | Jun 1, 2011 |
| 01001B | 1910.1200 Hazard Communication OSHA citation code: 19101200 G01 | Serious | 1 | 4 | $0 | $0 | Mar 11, 2011 | Sep 13, 2010 | Jun 1, 2011 |
| 01001C | 1910.1200 Hazard Communication OSHA citation code: 19101200 H01 | Serious | 1 | 4 | $0 | $0 | Mar 11, 2011 | Sep 13, 2010 | Jun 1, 2011 |
| 01002 | 1926.20 General Safety and Health Provisions OSHA citation code: 19260020 B01 | Serious | 1 | 4 | $1,250 | $405 | Mar 11, 2011 | Sep 13, 2010 | Jun 1, 2011 |
| 01003 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 B01 | Serious | 1 | 4 | $2,500 | $932 | Mar 11, 2011 | Sep 13, 2010 | Jun 1, 2011 |
| 01004 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 E01 I | Serious | 1 | 4 | $2,500 | $932 | Mar 11, 2011 | Sep 13, 2010 | Jun 1, 2011 |
| 01005 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 F03 | Serious | 1 | 4 | $2,500 | $1,013 | Mar 11, 2011 | Sep 13, 2010 | Jun 1, 2011 |
| 01006 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 G01 | Serious | 1 | 4 | $2,500 | $1,013 | Mar 11, 2011 | Sep 13, 2010 | Apr 20, 2011 |
Showing the 8 violations listed first by citation identifier. This inspection has 9 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
May 10, 2006#308644954May 10, 2006Planned (H) · Complete scope, Safety#308644954$4,0505 viol.5 violations$4,050 in penalties
Inspection #308644954
Dates
- Opened
- May 10, 2006
- Closing Conference Date
- May 10, 2006
- Contested
- Jun 21, 2006
- Final Order
- Apr 30, 2007
- Closed
- Jul 13, 2007
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 5
- Violation Types
- 4 repeat, 1 other-than-serious
- Initial Penalties
- $5,400
- Penalties on Record
- $4,050
- Site Address
- 8801 157th St, Overland Park, KS 66202
- Industry
- 238340 Tile and Terrazzo Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 5 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.454 Scaffolding - Training OSHA citation code: 19260454 C03 | Other | 1 | 4 | $600 | $450 | Mar 9, 2007 | Jun 21, 2006 | Apr 30, 2007 |
| 02001 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 B01 | Repeat | 1 | 4 | $1,200 | $900 | Jun 13, 2006 | Jun 21, 2006 | Apr 30, 2007 |
| 02002 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 E01 | Repeat | 1 | 4 | $1,200 | $900 | Jun 13, 2006 | Jun 21, 2006 | Apr 30, 2007 |
| 02003 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 G04 I | Repeat | 1 | 4 | $1,200 | $900 | Jun 13, 2006 | Jun 21, 2006 | Apr 30, 2007 |
| 02004 | 1926.452 Additional Requirements for Specific Scaffold Types OSHA citation code: 19260452 C02 | Repeat | 1 | 4 | $1,200 | $900 | Jun 13, 2006 | Jun 21, 2006 | Apr 30, 2007 |
Apr 14, 2005#308636620Apr 14, 2005Planned (H) · Complete scope, Safety#308636620$3,3709 viol.9 violations$3,370 in penalties
Inspection #308636620
Dates
- Opened
- Apr 14, 2005
- Closing Conference Date
- Apr 14, 2005
- Contested
- Jun 21, 2005
- Final Order
- Mar 8, 2006
- Closed
- Jan 3, 2007
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 3
Violations and Penalties
- Total Violations
- 9
- Violation Types
- 4 serious, 5 repeat
- Initial Penalties
- $21,800
- Penalties on Record
- $3,370
- Site Address
- 9608 150th St, Overland Park, KS 66215
- Industry
- 238140 Masonry Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (8 of 9 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.20 General Safety and Health Provisions OSHA citation code: 19260020 B01 | Serious | 1 | 2 | $600 | $90 | Jan 6, 2006 | Jun 21, 2005 | Mar 8, 2006 |
| 01001B | 1926.454 Scaffolding - Training OSHA citation code: 19260454 A | Serious | 1 | 2 | $0 | $0 | Jan 6, 2006 | Jun 21, 2005 | Mar 8, 2006 |
| 01002 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 H02 | Serious | 1 | 2 | $600 | $90 | Jun 2, 2005 | Jun 21, 2005 | Mar 8, 2006 |
| 01003 | 1926.452 Additional Requirements for Specific Scaffold Types OSHA citation code: 19260452 C02 | Serious | 1 | 2 | $1,400 | $210 | Jun 2, 2005 | Jun 21, 2005 | Mar 8, 2006 |
| 02001 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 B01 | Repeat | 1 | 2 | $4,000 | $600 | Jun 2, 2005 | Jun 21, 2005 | Mar 8, 2006 |
| 02002 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 C02 | Repeat | 16 | 2 | $4,000 | $600 | Jun 2, 2005 | Jun 21, 2005 | Mar 8, 2006 |
| 02003 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 E01 | Repeat | 1 | 2 | $2,800 | $420 | Jun 2, 2005 | Jun 21, 2005 | Mar 8, 2006 |
| 02004 | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 F03 | Repeat | 1 | 2 | $2,800 | $420 | Jun 2, 2005 | Jun 21, 2005 | Mar 8, 2006 |
Showing the 8 violations listed first by citation identifier. This inspection has 9 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Apr 17, 2003#306163791Apr 17, 2003Referral (C) · Complete scope, Safety#306163791$3,30019 viol.19 violations$3,300 in penalties
Inspection #306163791
Dates
- Opened
- Apr 17, 2003
- Closing Conference Date
- Apr 17, 2003
- Closed
- Jul 14, 2003
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 8
- Related Activity
- 1 referral
Violations and Penalties
- Total Violations
- 19
- Violation Types
- 15 serious, 4 other-than-serious
- Initial Penalties
- $6,150
- Penalties on Record
- $3,300
- Site Address
- 14309 Outlook, Overland Park, KS 66202
- Industry
- 238140 Masonry Contractors
Referral Inspection: This inspection record is categorized as a referral inspection in the DOL OSHA enforcement data. Referral inspections can result from another agency, another OSHA activity, or another source referring a potential hazard to OSHA.
Violations
Violation list (8 of 19 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 A06 | Serious | 1 | 8 | $1,050 | $660 | Jun 2, 2003 | - | - |
| 01001B | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 B08 | Serious | 1 | 8 | $0 | $0 | Jun 2, 2003 | - | - |
| 01001C | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 B11 | Serious | 1 | 8 | $0 | $0 | Jun 2, 2003 | - | - |
| 01001D | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 E01 | Serious | 1 | 8 | $0 | $0 | Jun 2, 2003 | - | - |
| 01002A | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 B01 | Serious | 1 | 8 | $1,500 | $660 | Jun 2, 2003 | - | - |
| 01002B | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 B03 II | Serious | 1 | 8 | $0 | $0 | Jun 2, 2003 | - | - |
| 01002C | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 G01 VII | Serious | 1 | 8 | $0 | $0 | Jun 2, 2003 | - | - |
| 01003A | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 B04 | Serious | 1 | 8 | $600 | $360 | Jun 16, 2003 | - | - |
Showing the 8 violations listed first by citation identifier. This inspection has 19 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
6 inspections, 2003 to 2012. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
Standards cited
Industry comparison
Specialty Trade Contractors, 559,279 employers with OSHA inspections. Arithmetic from DOL records.