Skip to content
SafetyRecord logoSafetyRecord
FONSON INC
$450
penalties
4
viol.
5
insp.

FONSON INC

FAIR & SIBLEY STS, HOWELL, MI 48843NAICS 237110 Water and Sewer Line and Related Structures Construction

Inspections
5
Nov 2007 to Apr 2013 · 5 safety, 0 health
Violations
4
across 5 inspections
Penalties on record
$450
latest amounts in DOL records
By classification
Serious 1Willful 0Repeat 1Other 2

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Apr 2, 2013Planned (H) · Partial scope, Safety#316165125$00 viol.

Inspection #316165125

Dates

Opened
Apr 2, 2013
Closing Conference Date
Apr 2, 2013
Closed
Apr 2, 2013

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
2

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
2900 Grand River, Howell, MI 48855
Industry
237110 Water and Sewer Line and Related Structures Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Sep 14, 2010Planned (H) · Partial scope, Safety#313325391$00 viol.

Inspection #313325391

Dates

Opened
Sep 14, 2010
Closing Conference Date
Sep 14, 2010
Closed
Sep 14, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
10

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Sibley & Michigan, Howell, MI 48843
Industry
238110 Poured Concrete Foundation and Structure Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Jun 4, 2010Planned (H) · Partial scope, Safety#313323685$00 viol.

Inspection #313323685

Dates

Opened
Jun 4, 2010
Closing Conference Date
Jun 4, 2010
Closed
Jun 4, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
5

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Court & Sibley St, Howell, MI 48843
Industry
237110 Water and Sewer Line and Related Structures Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Jul 14, 2009Planned (H) · Partial scope, Safety#308957679$4503 viol.

Inspection #308957679

Dates

Opened
Jul 14, 2009
Closing Conference Date
Jul 14, 2009
Contested
Aug 19, 2009
Final Order
Aug 9, 2010
Closed
Aug 9, 2010

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
11

Violations and Penalties

Total Violations
3
Violation Types
1 serious, 1 repeat, 1 other-than-serious
Initial Penalties
$450
Penalties on Record
$450
Site Address
Fair & Sibley Sts, Howell, MI 48843
Industry
237110 Water and Sewer Line and Related Structures Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010014084093302Serious12$150$150Aug 5, 2009Aug 19, 2009Aug 9, 2010
020014084094101Repeat12$300$300Aug 5, 2009Aug 19, 2009Aug 9, 2010
030014084.1721Other11$0$0Aug 5, 2009Aug 19, 2009Aug 9, 2010
Nov 2, 2007Planned (H) · Complete scope, Safety#308941525$01 viol.

Inspection #308941525

Dates

Opened
Nov 2, 2007
Closing Conference Date
Nov 2, 2007
Closed
Jan 31, 2008

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
5

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
1315 Chilson Rd, Howell, MI 48843
Industry
237110 Water and Sewer Line and Related Structures Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010014084094101Other11$0$0Dec 5, 2007--
Inspections 1 to 5 of 5, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

40840941012 citations · $300
40840933021 citation · $150
4084.17211 citation · $0

Industry comparison

Violations per inspection
This employer0.8
Industry average1.6
Penalties per inspection
This employer$90
Industry average$2,255

Heavy and Civil Engineering Construction, 70,282 employers with OSHA inspections. Arithmetic from DOL records.

Other inspected employers in HOWELL, MI

All employers in HOWELL →