PERFORM CONCRETE INC
1177-1229 POST ROAD (RT1), FAIRFIELD, CT 06824 · NAICS 238110 Poured Concrete Foundation and Structure Contractors
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jun 9, 2008#312163256Jun 9, 2008Programmed Related (I) · Partial scope, Safety#312163256$7,8003 viol.3 violations$7,800 in penalties
Inspection #312163256
Dates
- Opened
- Jun 9, 2008
- Closing Conference Date
- Jun 9, 2008
- Closed
- Mar 15, 2010
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 4
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 1 serious, 2 repeat
- Initial Penalties
- $3,000
- Penalties on Record
- $7,800
- Site Address
- 1107 Sasco Hill, Fairfield, CT 06824
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Programmed Related Inspection: This inspection record is categorized as a programmed related inspection in the DOL OSHA enforcement data. The public DOL category label is preserved here without adding extra interpretation beyond the government label.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B06 | Serious | 2 | 1 | $3,000 | $1,800 | Aug 14, 2008 | - | - |
| 02003A | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 B01 | Repeat | 1 | 1 | $0 | $6,000 | Aug 14, 2008 | - | - |
| 02003B | 1926.451 Scaffolding - General Requirements OSHA citation code: 19260451 G01 VII | Repeat | 1 | 1 | $0 | $0 | Aug 14, 2008 | - | - |
May 19, 2008#311931877May 19, 2008Complaint (B) · Partial scope, Safety#311931877$7,0003 viol.3 violations$7,000 in penalties
Inspection #311931877
Dates
- Opened
- May 19, 2008
- Closing Conference Date
- May 19, 2008
- Closed
- Feb 3, 2011
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 7
- Related Activity
- 1 complaint
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 2 serious, 1 repeat
- Initial Penalties
- $9,000
- Penalties on Record
- $7,000
- Site Address
- 1177-1229 Post Road (rt1), Fairfield, CT 06824
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Complaint Inspection: This inspection record is categorized as a complaint inspection in the DOL OSHA enforcement data. OSHA can open complaint-driven inspections after receiving safety or health complaints from workers or their representatives.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B01 | Serious | 2 | 1 | $3,000 | $2,000 | Jul 25, 2008 | - | - |
| 01001B | 1926.503 Fall Protection - Training Requirements OSHA citation code: 19260503 A01 | Serious | 3 | 2 | $0 | $0 | Aug 15, 2008 | - | - |
| 02001 | 1926.701 Concrete and Masonry Construction - General Requirements OSHA citation code: 19260701 B | Repeat | 2 | 1 | $6,000 | $5,000 | Jul 9, 2008 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
2 inspections, 2008 to 2008. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Standards cited
Industry comparison
Specialty Trade Contractors, 559,382 employers with OSHA inspections. Arithmetic from DOL records.
BLS 2024 survey: poured concrete foundation and structure contractors reported 2.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 10.7%; NAICS 23811 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source