Skip to content
SafetyRecord logoSafetyRecord
D & C ERECTORS, INC.
$15,750
penalties
7
viol.
2
insp.

D & C ERECTORS, INC.

1639 ROUTE 9, CLIFTON PARK, NY 12065NAICS 238120 Structural Steel and Precast Concrete Contractors

Inspections
2
Jul 2006 to Dec 2009 · 2 safety, 0 health
Violations
7
across 2 inspections
Penalties on record
$15,750
latest amounts in DOL records
By classification
Serious 5Willful 1Repeat 0Other 1

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Dec 3, 2009Planned (H) · Partial scope, Safety#313755878$15,0004 viol.

Inspection #313755878

Dates

Opened
Dec 3, 2009
Closing Conference Date
Dec 3, 2009
Closed
Aug 17, 2011

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
6

Violations and Penalties

Total Violations
4
Violation Types
3 serious, 1 willful
Initial Penalties
$18,800
Penalties on Record
$15,000
Site Address
1928 Rt9, Clifton Park, NY 12065
Industry
238120 Structural Steel and Precast Concrete Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.21
Safety Training and Education
OSHA citation code: 19260021 B02
Serious12$2,000$1,600Jan 25, 2010--
010021926.100
Head Protection (Construction)
OSHA citation code: 19260100 A
Serious12$800$600Jan 15, 2010--
010031926.453
Aerial Lifts
OSHA citation code: 19260453 B02 IV
Serious12$2,000$1,600Jan 15, 2010--
020011926.453
Aerial Lifts
OSHA citation code: 19260453 B02 V
Willful12$14,000$11,200Jan 15, 2010--
Jul 11, 2006Planned (H) · Complete scope, Safety#309207801$7503 viol.

Inspection #309207801

Dates

Opened
Jul 11, 2006
Closing Conference Date
Jul 11, 2006
Closed
Oct 4, 2006

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
3
Violation Types
2 serious, 1 other-than-serious
Initial Penalties
$750
Penalties on Record
$750
Site Address
1639 Route 9, Clifton Park, NY 12065
Industry
238120 Structural Steel and Precast Concrete Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (3 of 3 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.350
Gas Welding and Cutting
OSHA citation code: 19260350 A09
Serious12$375$375Aug 1, 2006--
010021926.350
Gas Welding and Cutting
OSHA citation code: 19260350 A10
Serious12$375$375Aug 1, 2006--
020011926.752
Steel Erection - Site Layout and Construction Sequence
OSHA citation code: 19260752 B
Other12$0$0Aug 1, 2006--
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.350Gas Welding and Cutting2 citations · $750
1926.453Aerial Lifts2 citations · $12,800
1926.21Safety Training and Education1 citation · $1,600

Industry comparison

Violations per inspection
This employer3.5
Industry average2.1
Penalties per inspection
This employer$7,875
Industry average$2,540

Specialty Trade Contractors, 559,382 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: structural steel and precast concrete contractors reported 2.8 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 13.9%; NAICS 23812 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in CLIFTON PARK, NY

All employers in CLIFTON PARK →