KENNY'S CONSTRUCTION
VA MEADOWS, HURRICANE, WV 25526 · NAICS 238160 Roofing Contractors
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Apr 15, 2011#315223651Apr 15, 2011OpenPlanned (H) · Complete scope, SafetyOpen#315223651$13,2008 viol.8 violations$13,200 in penalties
Inspection #315223651
Dates
- Opened
- Apr 15, 2011
- Closing Conference Date
- Apr 15, 2011
- Closed
- Open
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 8
- Violation Types
- 5 serious, 2 repeat, 1 other-than-serious
- Initial Penalties
- $25,740
- Penalties on Record
- $13,200
- Site Address
- Va Meadows, Hurricane, WV 25526
- Industry
- 238160 Roofing Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (8 of 8 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.20 General Safety and Health Provisions OSHA citation code: 19260020 B01 | Serious | 1 | 2 | $4,620 | $2,310 | Oct 7, 2011 | - | - |
| 01001B | 1926.503 Fall Protection - Training Requirements OSHA citation code: 19260503 A01 | Serious | 1 | 2 | $0 | $0 | Oct 3, 2011 | - | - |
| 01002A | 1910.1200 Hazard Communication OSHA citation code: 19101200 E01 | Serious | 1 | 2 | $1,980 | $990 | Oct 3, 2011 | - | - |
| 01002B | 1910.1200 Hazard Communication OSHA citation code: 19101200 G08 | Serious | 1 | 2 | $0 | $0 | Oct 3, 2011 | - | - |
| 01002C | 1910.1200 Hazard Communication OSHA citation code: 19101200 H01 | Serious | 1 | 2 | $0 | $0 | Oct 3, 2011 | - | - |
| 02001 | 1926.20 General Safety and Health Provisions OSHA citation code: 19260020 B02 | Repeat | 1 | 2 | $9,240 | $4,620 | Oct 3, 2011 | - | - |
| 02003 | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B13 | Repeat | 1 | 2 | $9,240 | $4,620 | Oct 3, 2011 | - | - |
| 03001 | 1903.19 Abatement Verification OSHA citation code: 19030019 C01 | Other | 7 | - | $660 | $660 | Mar 23, 2012 | - | - |
Apr 15, 2010#313372930Apr 15, 2010Planned (H) · Complete scope, Safety#313372930$6,00011 viol.11 violations$6,000 in penalties
Inspection #313372930
Dates
- Opened
- Apr 15, 2010
- Closing Conference Date
- Apr 15, 2010
- Closed
- Nov 18, 2011
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 6
Violations and Penalties
- Total Violations
- 11
- Violation Types
- 11 serious
- Initial Penalties
- $7,800
- Penalties on Record
- $6,000
- Site Address
- Va Meadows, Hurricane, WV 25526
- Industry
- 238160 Roofing Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (11 of 11 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.95 Criteria for Personal Protective Equipment (Construction) OSHA citation code: 19260095 C | Serious | 1 | 2 | $1,050 | $700 | May 18, 2010 | - | - |
| 01002 | 1926.100 Head Protection (Construction) OSHA citation code: 19260100 A | Serious | 1 | 2 | $1,050 | $700 | May 18, 2010 | - | - |
| 01003A | 1926.102 Eye and Face Protection (Construction) OSHA citation code: 19260102 A01 | Serious | 2 | 2 | $1,500 | $1,200 | May 18, 2010 | - | - |
| 01003B | 1926.21 Safety Training and Education OSHA citation code: 19260021 B02 | Serious | 1 | 2 | $0 | $0 | May 18, 2010 | - | - |
| 01004 | 1926.404 Electrical - Wiring Design and Protection (Construction) OSHA citation code: 19260404 F06 | Serious | 1 | 1 | $750 | $600 | May 18, 2010 | - | - |
| 01005A | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 G02 III | Serious | 1 | 1 | $750 | $600 | May 17, 2010 | - | - |
| 01005B | 1926.405 Electrical - Wiring Methods (Construction) OSHA citation code: 19260405 G02 IV | Serious | 1 | 1 | $0 | $0 | May 18, 2010 | - | - |
| 01006A | 1926.501 Fall Protection - Duty to Have Fall Protection OSHA citation code: 19260501 B13 | Serious | 1 | 3 | $2,100 | $1,700 | May 18, 2010 | - | - |
| 01006B | 1926.20 General Safety and Health Provisions OSHA citation code: 19260020 B02 | Serious | 1 | 3 | $0 | $0 | May 18, 2010 | - | - |
| 01007A | 1926.1053 Ladders (Construction) OSHA citation code: 19261053 B04 | Serious | 1 | 2 | $600 | $500 | May 18, 2010 | - | - |
| 01007B | 1926.1060 Stairways and Ladders - Training (Construction) OSHA citation code: 19261060 A01 III | Serious | 1 | 2 | $0 | $0 | May 18, 2010 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
2 inspections, 2010 to 2011. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Standards cited
Industry comparison
Specialty Trade Contractors, 559,382 employers with OSHA inspections. Arithmetic from DOL records.
BLS 2024 survey: roofing contractors reported 2.4 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 9.7%; NAICS 23816 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source