Skip to content
SafetyRecord logoSafetyRecord
SANTOS CONSTRUCTION INC
$10,513
penalties
20
viol.
2
insp.

SANTOS CONSTRUCTION INC

521 UPTON ROAD, SEVERN, MD 21144NAICS 238130 Framing Contractors

Inspections
2
Oct 2011 to Mar 2013 · 2 safety, 0 health
Violations
20
across 2 inspections
Penalties on record
$10,513
latest amounts in DOL records
By classification
Serious 4Willful 0Repeat 6Other 10

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Mar 8, 2013Planned (H) · Complete scope, Safety#317019461$9,98915 viol.

Inspection #317019461

Dates

Opened
Mar 8, 2013
Closing Conference Date
Mar 8, 2013
Closed
Apr 10, 2014

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
8

Violations and Penalties

Total Violations
15
Violation Types
2 serious, 6 repeat, 7 other-than-serious
Initial Penalties
$12,575
Penalties on Record
$9,989
Site Address
1409 Winter Pine Trail, Severn, MD 21144
Industry
238130 Framing Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (15 of 15 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011910.178
Powered Industrial Trucks
OSHA citation code: 19100178 L01 I
Serious11$1,225$857Jun 18, 2013--
0100250104
OSHA citation code: 50104 A
Serious11$1,050$840May 10, 2013--
020011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 II
Repeat18$2,800$2,240May 10, 2013--
020021926.501
Fall Protection - Duty to Have Fall Protection
OSHA citation code: 19260501 B13
Repeat15$2,400$1,920May 10, 2013--
020031926.503
Fall Protection - Training Requirements
OSHA citation code: 19260503 B01
Repeat14$400$320May 10, 2013--
020041926.1051
Stairways - General Requirements (Construction)
OSHA citation code: 19261051 A
Repeat15$2,400$1,920May 10, 2013--
020051926.1053
Ladders (Construction)
OSHA citation code: 19261053 B04
Repeat11$800$640May 10, 2013--
020061926.1053
Ladders (Construction)
OSHA citation code: 19261053 B13
Repeat15$800$640May 10, 2013--
030011910.178
Powered Industrial Trucks
OSHA citation code: 19100178 L06
Other11$175$140Jun 18, 2013--
03002A1910.1200
Hazard Communication
OSHA citation code: 19101200 E01
Other18$525$472Jun 18, 2013--
03002B1910.1200
Hazard Communication
OSHA citation code: 19101200 H01
Other18$0$0Jun 18, 2013--
03002C1910.1200
Hazard Communication
OSHA citation code: 19101200 G08
Other18$0$0May 10, 2013--
03002D50405
OSHA citation code: 50405 B03
Other18$0$0May 10, 2013--
03002E50406
OSHA citation code: 50406 A01
Other18$0$0May 28, 2013--
03002F50408
OSHA citation code: 50408 A01
Other18$0$0May 10, 2013--
Oct 25, 2011Planned (H) · Complete scope, Safety#316074400$5245 viol.

Inspection #316074400

Dates

Opened
Oct 25, 2011
Closing Conference Date
Oct 25, 2011
Closed
Mar 13, 2012

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
6

Violations and Penalties

Total Violations
5
Violation Types
2 serious, 3 other-than-serious
Initial Penalties
$524
Penalties on Record
$524
Site Address
521 Upton Road, Severn, MD 21144
Industry
238130 Framing Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 5 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.404
Electrical - Wiring Design and Protection (Construction)
OSHA citation code: 19260404 B01 II
Serious14$262$262Dec 19, 2011--
010021926.501
Fall Protection - Duty to Have Fall Protection
OSHA citation code: 19260501 B13
Serious74$262$262Dec 19, 2011--
020011926.503
Fall Protection - Training Requirements
OSHA citation code: 19260503 B01
Other13$0$0Dec 22, 2011--
020021926.1052
Stairways (Construction)
OSHA citation code: 19261052 C01 I
Other14$0$0Dec 19, 2011--
020031926.1052
Stairways (Construction)
OSHA citation code: 19261052 C01 II
Other14$0$0Dec 19, 2011--
Inspections 1 to 2 of 2, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1910.1200Hazard Communication3 citations · $472
1926.404Electrical - Wiring Design and Protection (Construction)2 citations · $2,502
1926.501Fall Protection - Duty to Have Fall Protection2 citations · $2,182

Industry comparison

Violations per inspection
This employer10.0
Industry average2.1
Penalties per inspection
This employer$5,257
Industry average$2,540

Specialty Trade Contractors, 559,382 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: framing contractors reported 4.6 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 9.8%; NAICS 23813 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in SEVERN, MD

All employers in SEVERN →