LEONARD S. FIORE, INCORPORATED
WEST CHILLER PLANT, WHITE COURSE DRIVE, STATE COLLEGE, PA 16804 · NAICS 238110 Poured Concrete Foundation and Structure Contractors
Having inspection records is common for businesses in regulated industries. Data and methodology
Inspection records
Jul 29, 1988#100392463Jul 29, 1988Planned (H) · Complete scope, Safety#100392463$01 viol.1 violation$0 in penalties
Inspection #100392463
Dates
- Opened
- Jul 29, 1988
- Closing Conference Date
- Jul 29, 1988
- Closed
- Sep 14, 1988
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 2
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Martin & Herman Drive, State College, PA 16801
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.550 Cranes and Derricks OSHA citation code: 19260550 A05 | Other | 1 | 1 | $0 | $0 | Aug 29, 1988 | - | - |
Jul 15, 1988#765214Jul 15, 1988Planned (H) · Complete scope, Safety#765214$7,82515 viol.15 violations$7,825 in penalties
Inspection #765214
Dates
- Opened
- Jul 15, 1988
- Closing Conference Date
- Jul 15, 1988
- Closed
- Sep 26, 1989
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 45
Violations and Penalties
- Total Violations
- 15
- Violation Types
- 11 serious, 1 repeat, 3 other-than-serious
- Initial Penalties
- $11,800
- Penalties on Record
- $7,825
- Site Address
- 400 Block South Allen Street, State College, PA 16801
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (5 of 15 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.28 Personal Protective Equipment OSHA citation code: 19260028 A | Serious | 1 | 1 | $400 | $300 | Sep 29, 1988 | - | - |
| 01002 | 1926.100 Head Protection (Construction) OSHA citation code: 19260100 A | Serious | 1 | 45 | $500 | $375 | Oct 7, 1988 | - | - |
| 01003A | 1926.105 Safety Nets OSHA citation code: 19260105 A | Serious | 1 | 1 | $1,000 | $750 | Oct 2, 1988 | - | - |
| 01003B | 1926.20 General Safety and Health Provisions OSHA citation code: 19260020 B01 | Serious | 1 | - | $0 | $0 | Oct 27, 1988 | - | - |
| 01003C | 1926.20 General Safety and Health Provisions OSHA citation code: 19260020 B02 | Serious | 1 | 45 | $0 | $0 | Oct 7, 1988 | - | - |
Showing the 5 violations listed first by citation identifier. This inspection has 15 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.
Jul 5, 1988#100392489Jul 5, 1988Planned (H) · No Inspection scope, Safety#100392489$00 viol.0 violations$0 in penalties
Inspection #100392489
Dates
- Opened
- Jul 5, 1988
- Closing Conference Date
- Jul 5, 1988
- Closed
- Jul 14, 1988
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- Not recorded
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 1012 East Boal Avenue, State College, PA 16801
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Dec 4, 1987#767194Dec 4, 1987Planned (H) · No Inspection scope, Safety#767194$00 viol.0 violations$0 in penalties
Inspection #767194
Dates
- Opened
- Dec 4, 1987
- Closing Conference Date
- Dec 4, 1987
- Closed
- Dec 9, 1987
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Not recorded
- Number of Employees
- Not recorded
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Penn State University, State College, PA 16802
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Nov 4, 1987#765545Nov 4, 1987Planned (H) · Complete scope, Safety#765545$1552 viol.2 violations$155 in penalties
Inspection #765545
Dates
- Opened
- Nov 4, 1987
- Closing Conference Date
- Nov 4, 1987
- Closed
- Dec 3, 1987
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 5
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 serious
- Initial Penalties
- $210
- Penalties on Record
- $155
- Site Address
- 1300 Fox Hollow Road, State College, PA 16803
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001A | 1926.350 Gas Welding and Cutting OSHA citation code: 19260350 A09 | Serious | 2 | 2 | $210 | $155 | Nov 22, 1987 | - | - |
| 01001B | 1926.350 Gas Welding and Cutting OSHA citation code: 19260350 J | Serious | 2 | 2 | $0 | $0 | Nov 22, 1987 | - | - |
Aug 4, 1987#100391416Aug 4, 1987Planned (H) · No Inspection scope, Safety#100391416$00 viol.0 violations$0 in penalties
Inspection #100391416
Dates
- Opened
- Aug 4, 1987
- Closing Conference Date
- Aug 4, 1987
- Closed
- Aug 7, 1987
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- Not recorded
- Number of Employees
- Not recorded
Violations and Penalties
- Total Violations
- 0
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- 8537 Burrowes Street, State College, PA 16801
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Oct 22, 1986#810986Oct 22, 1986Planned (H) · Complete scope, Safety#810986$8002 viol.2 violations$800 in penalties
Inspection #810986
Dates
- Opened
- Oct 22, 1986
- Closing Conference Date
- Oct 22, 1986
- Closed
- Apr 14, 1987
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 20
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 serious
- Initial Penalties
- $2,000
- Penalties on Record
- $800
- Site Address
- 120 Burrowes Street, State College, PA 16801
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.450 Scaffolding - Scope, Application, and Definitions OSHA citation code: 19260450 A09 | Serious | 1 | 10 | $400 | $200 | Jan 25, 1987 | - | - |
| 02001 | 1926.500 Fall Protection - Scope, Application, and Definitions OSHA citation code: 19260500 D01 | Serious | 1 | 20 | $1,600 | $600 | Mar 20, 1987 | - | - |
Jul 9, 1986#810648Jul 9, 1986Planned (H) · Complete scope, Safety#810648$2501 viol.1 violation$250 in penalties
Inspection #810648
Dates
- Opened
- Jul 9, 1986
- Closing Conference Date
- Jul 9, 1986
- Closed
- Sep 9, 1986
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 10
Violations and Penalties
- Total Violations
- 1
- Violation Types
- 1 repeat
- Initial Penalties
- $480
- Penalties on Record
- $250
- Site Address
- Route 26 And Porter Avenue, State College, PA 16801
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (1 of 1 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.500 Fall Protection - Scope, Application, and Definitions OSHA citation code: 19260500 D01 | Repeat | 1 | 4 | $480 | $250 | Aug 25, 1986 | - | - |
Jun 25, 1986#810531Jun 25, 1986Planned (H) · Complete scope, Safety#810531$1603 viol.3 violations$160 in penalties
Inspection #810531
Dates
- Opened
- Jun 25, 1986
- Closing Conference Date
- Jun 25, 1986
- Closed
- Jan 7, 1987
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 15
Violations and Penalties
- Total Violations
- 3
- Violation Types
- 1 serious, 2 other-than-serious
- Initial Penalties
- $160
- Penalties on Record
- $160
- Site Address
- Off North Atheraton St., State College, PA 16801
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (3 of 3 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.500 Fall Protection - Scope, Application, and Definitions OSHA citation code: 19260500 D01 | Serious | 1 | 1 | $160 | $160 | Nov 21, 1986 | - | - |
| 02001 | 1926.500 Fall Protection - Scope, Application, and Definitions OSHA citation code: 19260500 B01 | Other | 1 | 10 | $0 | $0 | Nov 21, 1986 | - | - |
| 02002 | 1926.500 Fall Protection - Scope, Application, and Definitions OSHA citation code: 19260500 B08 | Other | 1 | 1 | $0 | $0 | Nov 21, 1986 | - | - |
May 22, 1986#100414937May 22, 1986Planned (H) · Complete scope, Safety#100414937$02 viol.2 violations$0 in penalties
Inspection #100414937
Dates
- Opened
- May 22, 1986
- Closing Conference Date
- May 22, 1986
- Closed
- Oct 30, 1986
Inspection
- Advance Notice
- No
- Owner Type
- Private
- Union Status
- No
- Number of Employees
- 24
Violations and Penalties
- Total Violations
- 2
- Violation Types
- 2 other-than-serious
- Initial Penalties
- $0
- Penalties on Record
- $0
- Site Address
- Pollock Rd., State College, PA 16801
- Industry
- 238110 Poured Concrete Foundation and Structure Contractors
Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.
Violations
Violation list (2 of 2 shown)
| Citation | Standard | Type | Instances | Exposed | Initial | Current | Abatement | Contest | Final Order |
|---|---|---|---|---|---|---|---|---|---|
| 01001 | 1926.350 Gas Welding and Cutting OSHA citation code: 19260350 A09 | Other | 1 | 4 | $0 | $0 | Jun 16, 1986 | - | - |
| 01002 | 1926.350 Gas Welding and Cutting OSHA citation code: 19260350 J | Other | 1 | 4 | $0 | $0 | Jun 16, 1986 | - | - |
Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records
About these records
A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).
This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.
OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.
OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.
Understanding These Penalties
The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.
50 inspections, 2000 to 2026. Each row is one inspection; point at or tap a row for its dates and totals.
Source: DOL OSHA enforcement data (inspections and violations), linked via activity_nr (exact government key).
Penalty changes: Amounts shown reflect what OSHA's enforcement record publishes. The reason for any change is not stated unless OSHA's record explicitly says so.
Short cases: When a case closed soon after it opened, the closed marker is drawn slightly to the right so both markers stay visible. Each row's card shows the exact dates.
The timeline shows the 50 most recent of 84 inspections with a recorded opening date.
Standards cited
Industry comparison
Specialty Trade Contractors, 558,619 employers with OSHA inspections. Arithmetic from DOL records.