Skip to content
SafetyRecord logoSafetyRecord
LEONARD S. FIORE, INCORPORATED
$98,810
penalties
118
viol.
84
insp.

LEONARD S. FIORE, INCORPORATED

WEST CHILLER PLANT, WHITE COURSE DRIVE, STATE COLLEGE, PA 16804NAICS 238110 Poured Concrete Foundation and Structure Contractors

Inspections
84
Jul 1982 to Feb 2026 · 83 safety, 1 health
Violations
118
across 84 inspections
Penalties on record
$98,810
latest amounts in DOL records
By classification
Serious 68Willful 1Repeat 6Other 43

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Nov 12, 1982Planned (H) · Complete scope, Safety#12556510$01 viol.

Inspection #12556510

Dates

Opened
Nov 12, 1982
Closing Conference Date
Nov 12, 1982
Closed
Feb 2, 1983

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
8

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Whitehall Rd & Industrial Park, State College, PA 16801
Industry
238110 Poured Concrete Foundation and Structure Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011903.2
Posting of Notices; Availability of the Act, Regulations and Applicable Standards
OSHA citation code: 19030002 A01
Other1-$0$0Dec 10, 1982--
Jul 23, 1982Planned (H) · Complete scope, Safety#12555959$4801 viol.

Inspection #12555959

Dates

Opened
Jul 23, 1982
Closing Conference Date
Jul 23, 1982
Closed
Sep 22, 1982

Inspection

Advance Notice
Yes
Owner Type
Not recorded
Union Status
No
Number of Employees
10

Violations and Penalties

Total Violations
1
Violation Types
1 serious
Initial Penalties
$480
Penalties on Record
$480
Site Address
South Pugh St & Calderway, State College, PA 16801
Industry
238110 Poured Concrete Foundation and Structure Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.500
Fall Protection - Scope, Application, and Definitions
OSHA citation code: 19260500 D01
Serious1-$480$480Aug 12, 1982--
Jul 22, 1982Planned (H) · Complete scope, Safety#12555942$3502 viol.

Inspection #12555942

Dates

Opened
Jul 22, 1982
Closing Conference Date
Jul 22, 1982
Closed
Sep 22, 1982

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
4

Violations and Penalties

Total Violations
2
Violation Types
1 serious, 1 other-than-serious
Initial Penalties
$350
Penalties on Record
$350
Site Address
Cato Ave & Research Dr, State College, PA 16801
Industry
238110 Poured Concrete Foundation and Structure Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.602
Material Handling Equipment
OSHA citation code: 19260602 A10
Serious1-$350$350Aug 9, 1982--
020011926.50
Medical Services and First Aid (Construction)
OSHA citation code: 19260050 F
Other1-$0$0Aug 5, 1982--
Jul 6, 1982Planned (H) · Complete scope, Safety#12555868$4902 viol.

Inspection #12555868

Dates

Opened
Jul 6, 1982
Closing Conference Date
Jul 6, 1982
Closed
Sep 22, 1982

Inspection

Advance Notice
Not recorded
Owner Type
Not recorded
Union Status
No
Number of Employees
3

Violations and Penalties

Total Violations
2
Violation Types
1 serious, 1 other-than-serious
Initial Penalties
$490
Penalties on Record
$490
Site Address
Fraser St & College Ave, State College, PA 16801
Industry
238110 Poured Concrete Foundation and Structure Contractors

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.652
Excavations - Protection of Employees
OSHA citation code: 19260652 C
Serious1-$490$490Jul 17, 1982--
020011926.50
Medical Services and First Aid (Construction)
OSHA citation code: 19260050 F
Other1-$0$0Jul 22, 1982--
Inspections 81 to 84 of 84, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.500Fall Protection - Scope, Application, and Definitions19 citations · $10,880
1926.451Scaffolding - General Requirements13 citations · $11,130
1926.404Electrical - Wiring Design and Protection (Construction)8 citations · $2,675

Industry comparison

Violations per inspection
This employer1.4
Industry average2.1
Penalties per inspection
This employer$1,176
Industry average$2,541

Specialty Trade Contractors, 558,619 employers with OSHA inspections. Arithmetic from DOL records.

Other inspected employers in STATE COLLEGE, PA

All employers in STATE COLLEGE →