Skip to content
SafetyRecord logoSafetyRecord
TELESOURCE CNMI,INC.
$13,733
penalties
21
viol.
14
insp.

TELESOURCE CNMI,INC.

KOBLERVILLE EXPANSION PROJECT, KOBLERVILLE, SAIPAN, MP 96950NAICS 236220 Commercial and Institutional Building Construction

Inspections
14
Nov 1999 to Mar 2005 · 14 safety, 0 health
Violations
21
across 14 inspections
Penalties on record
$13,733
latest amounts in DOL records
By classification
Serious 11Willful 0Repeat 2Other 8

Having inspection records is common for businesses in regulated industries. Data and methodology

Inspection records

Mar 21, 2005Planned (H) · Complete scope, Safety#113616296$01 viol.

Inspection #113616296

Dates

Opened
Mar 21, 2005
Closing Conference Date
Mar 21, 2005
Closed
Jul 25, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
27

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$0
Penalties on Record
$0
Site Address
Cnmi Adult Correctional Facility, Saipan, MP 96950
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.28
Personal Protective Equipment
OSHA citation code: 19260028 A
Other11$0$0Jul 5, 2005--
Aug 12, 2004Planned (H) · Partial scope, Safety#113615140$1,9502 viol.

Inspection #113615140

Dates

Opened
Aug 12, 2004
Closing Conference Date
Aug 13, 2004
Closed
Jan 3, 2005

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
120

Violations and Penalties

Total Violations
2
Violation Types
2 serious
Initial Penalties
$2,600
Penalties on Record
$1,950
Site Address
Cnmi Adult Correctional Facility, Saipan, MP 96950
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (2 of 2 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.300
General Requirements - Tools, Hand and Power
OSHA citation code: 19260300 B01
Serious13$1,300$975Dec 15, 2004--
010021926.501
Fall Protection - Duty to Have Fall Protection
OSHA citation code: 19260501 B01
Serious110$1,300$975Dec 15, 2004--
Apr 6, 2004Planned (H) · Complete scope, Safety#307566679$3,7507 viol.

Inspection #307566679

Dates

Opened
Apr 6, 2004
Closing Conference Date
Apr 7, 2004
Closed
Oct 26, 2004

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
120

Violations and Penalties

Total Violations
7
Violation Types
3 serious, 1 repeat, 3 other-than-serious
Initial Penalties
$9,400
Penalties on Record
$3,750
Site Address
Correction Facility, Suspe, Saipan, MP 96950
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (5 of 7 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010015A0001
General Duty Clause, Section 5(a)(1)
Serious16$1,600$960Sep 29, 2004--
01002A1926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 G02 III
Other11$600$0Aug 18, 2004--
01002B1926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 G02 IV
Other134$0$0Aug 18, 2004--
01002C1926.405
Electrical - Wiring Methods (Construction)
OSHA citation code: 19260405 G02 V
Other134$0$0Aug 18, 2004--
01003A1926.602
Material Handling Equipment
OSHA citation code: 19260602 A02 I
Serious12$1,200$390Aug 24, 2004--

Showing the 5 violations listed first by citation identifier. This inspection has 7 total violations documented in the U.S. Department of Labor OSHA enforcement database. The complete violation list is available at enforcedata.dol.gov.

Aug 21, 2003Planned (H) · Complete scope, Safety#113611123$4,0004 viol.

Inspection #113611123

Dates

Opened
Aug 21, 2003
Closing Conference Date
Aug 21, 2003
Closed
Dec 31, 2003

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
25

Violations and Penalties

Total Violations
4
Violation Types
3 serious, 1 other-than-serious
Initial Penalties
$7,825
Penalties on Record
$4,000
Site Address
Cnmi Adult Correctional Facility, Saipan, MP 96950
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (4 of 4 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.150
Fire Protection (Construction)
OSHA citation code: 19260150 C01 I
Serious1025$825$500Dec 2, 2003--
010021926.501
Fall Protection - Duty to Have Fall Protection
OSHA citation code: 19260501 B01
Serious1025$3,500$1,750Nov 25, 2003--
010031926.502
Fall Protection Systems Criteria and Practices
OSHA citation code: 19260502 B03
Serious1025$3,500$1,750Nov 25, 2003--
020011926.25
Housekeeping
OSHA citation code: 19260025 A
Other225$0$0Dec 2, 2003--
Sep 4, 2002Planned (H) · Complete scope, Safety#113607196$00 viol.

Inspection #113607196

Dates

Opened
Sep 4, 2002
Closing Conference Date
Sep 4, 2002
Closed
Sep 12, 2002

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
88

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Airport Project, Saipan, MP 96950
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Aug 28, 2002Planned (H) · Complete scope, Safety#110530565$7881 viol.

Inspection #110530565

Dates

Opened
Aug 28, 2002
Closing Conference Date
Aug 28, 2002
Closed
Jan 9, 2003

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
90

Violations and Penalties

Total Violations
1
Violation Types
1 serious
Initial Penalties
$1,050
Penalties on Record
$788
Site Address
Cnmi Adult Correctional Facility, Saipan, MP 96950
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.701
Concrete and Masonry Construction - General Requirements
OSHA citation code: 19260701 B
Serious6390$1,050$788Dec 20, 2002--
Aug 28, 2002Planned (H) · Complete scope, Safety#110530557$00 viol.

Inspection #110530557

Dates

Opened
Aug 28, 2002
Closing Conference Date
Aug 28, 2002
Closed
Aug 28, 2002

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
2

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Office Bldg. Airport Road, Saipan, MP 96950
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Apr 8, 2002Planned (H) · Complete scope, Safety#106392293$00 viol.

Inspection #106392293

Dates

Opened
Apr 8, 2002
Closing Conference Date
Apr 8, 2002
Closed
Apr 8, 2002

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
10

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Retsa Development Inc. Bldg., By Detention Center, Saipan, MP 96950
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Aug 30, 2001Planned (H) · Complete scope, Safety#110527488$2,1001 viol.

Inspection #110527488

Dates

Opened
Aug 30, 2001
Closing Conference Date
Aug 30, 2001
Closed
Jun 6, 2002

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
90

Violations and Penalties

Total Violations
1
Violation Types
1 other-than-serious
Initial Penalties
$4,200
Penalties on Record
$2,100
Site Address
South Of Airport Near Detention Center, Saipan, MP 96950
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Violations

Violation list (1 of 1 shown)
CitationStandardTypeInstancesExposedInitialCurrentAbatementContestFinal Order
010011926.451
Scaffolding - General Requirements
OSHA citation code: 19260451 G01 VII
Other11$4,200$2,100Dec 18, 2001--
Aug 27, 2001Planned (H) · Complete scope, Safety#110527363$00 viol.

Inspection #110527363

Dates

Opened
Aug 27, 2001
Closing Conference Date
Aug 27, 2001
Closed
Aug 27, 2001

Inspection

Advance Notice
No
Owner Type
Private
Union Status
No
Number of Employees
90

Violations and Penalties

Total Violations
0
Initial Penalties
$0
Penalties on Record
$0
Site Address
Koblerville Expansion Project, Koblerville, Saipan, MP 96950
Industry
236220 Commercial and Institutional Building Construction

Planned Inspection: This inspection record is categorized as a planned inspection in the DOL OSHA enforcement data. Planned inspections are part of OSHA's scheduled enforcement activity rather than being opened directly from a complaint or reported incident at that worksite.

Inspections 1 to 10 of 14, newest first

Penalty amounts may differ from final amounts after settlement or judicial review. How to read these records

About these records

A company page groups inspections with the same normalized employer name, city and state; it is not a legal-entity identifier (how pages are grouped).

This page displays public OSHA enforcement data. Status text follows the DOL inspection record first and may include citation-level context when the inspection feed and citation records are out of sync. Penalty amounts shown reflect the latest penalty amounts on record in the DOL database and may differ from initial assessments or final amounts. This is not an official OSHA resource.

OSHA's public enforcement data does not publish a "guilty" or "not guilty" field for inspections. The closest outcome fields available are the citation counts, penalty amounts, contest dates, final-order dates, and the inspection close date shown on this page. How to interpret these status fields. How initial and current penalties are recorded.

OSHA may publish multiple citation rows in the same inspection with the same standard and penalty fields. Separate rows can still differ in OSHA metadata such as citation identifier, recorded instance count, exposed workers, or gravity value. Contest and Final Order columns show citation-level dates from OSHA's enforcement record. A dash means OSHA's record does not currently show that activity for the citation.

Understanding These Penalties

The maximum penalty for a serious violation in 2025 is $16,550 per violation. For willful violations, the range is $11,823 to $165,514. The current penalty column shows the latest amount on record in OSHA's database for each citation. When the current penalty differs from the initial penalty, OSHA's records show that the amount changed during the enforcement process, but this page does not determine the specific reason for each change. Penalty amounts are set by OSHA and adjusted annually for inflation.

Standards cited

1926.701Concrete and Masonry Construction - General Requirements4 citations · $3,308
1926.501Fall Protection - Duty to Have Fall Protection3 citations · $3,250
1926.405Electrical - Wiring Methods (Construction)3 citations · $0

Industry comparison

Violations per inspection
This employer1.5
Industry average1.5
Penalties per inspection
This employer$981
Industry average$1,285

Construction of Buildings, 202,638 employers with OSHA inspections. Arithmetic from DOL records.

BLS 2024 survey: nonresidential building construction reported 1.9 injuries and illnesses per 100 full-time workers (total recordable cases, national, private industry; relative standard error 6.8%; NAICS 2362 level). This is an industry-wide average from a federal survey, not a measurement of this establishment. Source

Other inspected employers in SAIPAN, MP

All employers in SAIPAN →